Presentation is loading. Please wait.

Presentation is loading. Please wait.

3-D & 4-D GIS for Solving Field Development Problems John D. Grace, Ph.D. Earth Science Associates www.earthsci.com.

Similar presentations


Presentation on theme: "3-D & 4-D GIS for Solving Field Development Problems John D. Grace, Ph.D. Earth Science Associates www.earthsci.com."— Presentation transcript:

1 3-D & 4-D GIS for Solving Field Development Problems John D. Grace, Ph.D. Earth Science Associates www.earthsci.com

2 3-D/4-D GIS The 2-D Limitation GIS Mainly a Regional/Exploration Tool Databases Lose Detail at Large Scale Stacked Reservoirs Impede Field Use Reservoir Structure Ignored Gridding Capability Weak

3 3-D/4-D GIS 2-D As Integration Tool Reservoirs, Platforms, Wells & Completions Reservoir Production Chart Well Test Report for Selected Completion Completions Are Scaled to 1999 Gas Production

4 3-D/4-D GIS 3-D Foundations Hardware: 32 MB VRAM Video Cards Software: Spatial and 3-D Analyst Data: Well Directional Surveys Shape Type: Multipatches 3-D GIS - Not Just Visualization Tool

5 3-D/4-D GIS Directional Surveys = PolyLineZs Straight Holes Deviated Holes Graphic Reference Cage High Island 105

6 3-D/4-D GIS Completions & Paleo Use Multipatch Symbols High Island 105 Multipatch Top Hung On Perf or Sand Top Multipatch Bottom Set at Perf Bottom Second Comp In Deeper Sand

7 3-D/4-D GIS 3-D Reservoir Estimation Grid Sand/Perf Tops & Perf Bottoms Calculate Productive Area in 2-D –Use Drainage Area of Gas & Oil Comps –Use Negative Area of Dry Holes Cut Top/Bottom Grids with 2-D Poly Convert Grids to Multipatchs

8 3-D/4-D GIS Grid Reservoir Top & Bottom Wells Top Perf Grid Comp #1 Comp #2 Bottom Perf Grid

9 3-D/4-D GIS Calculate 2-D Productive Area Based on Wells Positive Influence of Productive Comps Negative Influence of Dry Holes

10 3-D/4-D GIS Cut Grids with 2-D Poly Top Perf Grid Bottom Perf Grid Productive Area of Reservoir

11 3-D/4-D GIS Convert to Multipatch/Wireframe Multipatch Wireframe of Reservoir Completions Reservoir “Volygon” Honors Structure & Isopach

12 3-D/4-D GIS Examples of 3-D GIS from GOM 3

13 3-D/4-D GIS 4-D Foundations Map Production Parameters over Time –Using “Traditional” Gridding Algorithms –Using Radial Flow Equations Exploit 3-D GIS Environment –Map Performance on Reservoir Structure –Extract Grid Statistics “Animate” Grids over Time

14 3-D/4-D GIS Gridding Production - Traditional Control at Each Completion Clip at Reservoir Boundary IDW Grid of Production Rates

15 3-D/4-D GIS Gridding by Radial Flow Equation P r = P w +  Q Bo Bo  K h ln r rwrw Reservoir pressure at radius of distance r from the well Presure at well Production Fluid/Gas Properties Rock/Completion Properties Distance from Well The radial flow equation is used to calculate the movement of fluids and gases in a reservoir in response to production.

16 3-D/4-D GIS Radial Flow Advantages Mapping Fluid/Gas Movement Honors Changing Rock/Fluid Properties –Thickness and relative permeability –GOR and water saturation Exposes Performance Details –Completion Efficiency –By-passed oil/gas and heterogeneities –Flow vectors for infill drilling

17 3-D/4-D GIS Creating 4-D Animation Choose Sand in 3-D Scene Choose Map Parameters Extract Production Data from Oracle 3-D AnalystODBC/Oracle Spatial Analyst Grid Production for each Month/Year Drap Grids on Reservoir Top 3-D Analyst Enter 3-D from 2-D GIS ArcView Sequentially turn on grids to animate scene

18 3-D/4-D GIS Examples of 4-D GIS from GOM 3

19 3-D/4-D GIS 4-D GIS Analytic Platform Completion/Reservoir Performance Identify Water/Gas “Break Through” Identify By-Passed Oil/Gas Map Reservoir Heterogeneities Compute Flow Vectors for Infill Wells “Quick-Look” Reservoir Simulation

20 3-D/4-D GIS 4-D As Integration Tool 2-D Map Production Chart 1993 Oil Production in 3-D 4-D Controls


Download ppt "3-D & 4-D GIS for Solving Field Development Problems John D. Grace, Ph.D. Earth Science Associates www.earthsci.com."

Similar presentations


Ads by Google