MED SR 18 Corridor Project MED-18-12.99 PID 92953 October 13, 2015.

Similar presentations


Presentation on theme: "MED SR 18 Corridor Project MED-18-12.99 PID 92953 October 13, 2015."— Presentation transcript:

1 MED SR 18 Corridor Project MED-18-12.99 PID 92953 October 13, 2015

2

3 History/Background In 2004 MED-18-15.13 and MED-18-16.03 projects completed; reduced congestion and increased mobility In 2007 MED-18-13.45 completed; SR 18 bridge replaced over West Branch of the Rocky River In 2007 a Planning Study was completed for this section In 2012 MED-18-12.99 received funding for Preliminary Engineering and Detailed Design Phases

4 Purpose and Need The purpose of this project is to improve safety and reduce congestion Improve capacity to carry current and projected traffic demands with high accident rates Increase mobility

5 Current Conditions SR 18 is Urban Principal Arterial developed with various commercial and medical facilities including The Cleveland Clinic (Medina General), recently opened Summa Health Center and several University Hospital facilities The number of lanes vary from 2 to 5 through the 2 mile project area Average Daily Traffic is 17,645 to 29,788 Volume to Capacity Ratio is 1.20

6 Corridor Statistics Appears on the latest Highway Safety Program This section ranks as the #1, most congested section in the NOACA region Identified in Connections 2030 - NOACA’s 20 year Transportation Plan

7

8 Project Description Widen SR 18 o 2 lanes to 3 (Medina City east Corp to Foote Road) o 3 lanes to 5 lanes (Foote Road To River Styx Road) o 5 lanes to 7 lanes (River Styx Road to Nettleton Road) Pavement Replacement Access Management Two Service Roads Multi-Use Path New Signal System

9 Project Schedule 2012/13Preliminary Engineering 2015/16Detail Design – In Progress 2016/17Right of Way 2019Construction

10 Funding Preliminary Engineering– Funding Approved Detailed Design – Funding Approved Current Request is for $5 million to complete the Right of Way phase of the project.

11 Right of Way Scope of Work 115 parcels – Temporary and Permanent Right of Way 1 Parking lot impacted 29 Commercial Drives potentially reconfigured No total takes – all strip takes

12 Right of Way Costs 115 Parcels February 2016 Acquisition$4,000,000 Real Estate Services$1,000,000 Total$5,000,000

13 Questions


Download ppt "MED SR 18 Corridor Project MED-18-12.99 PID 92953 October 13, 2015."