1 The Polarized Internal Gas Target of ANKE at COSY
Ralf Engels Institute for Nuclear Physics (IKP) Forschungszentrum Jülich PST 05 Tokyo, Japan November 16, 2005

2 COSY  COoler SYnchrotron
storage ring for (un-) polarized proton and deuteron beams with momentum up to 3700 MeV/c COSY used for: internal experiments - with the circulating beam (ANKE, COSY-11, EDDA, PISA) external experiments - with the extracted beam (BIG KARL, JESSICA, NESSI, TOF) Ralf PST 05

3 PIT setup Polarized internal gas target setup
at the laboratory consist of: Atomic Beam Source Test chamber with storage cell prototype Lamb-Shift Polarimeter Setup at the laboratory Ralf PST 05

4 Atomic Beam Source H beam intensity ~ 8.0x1016 at/s 16.11.2005
Ralf PST 05

5 ABS beam profile σ = 2.85 ± 0.42 mm Ralf PST 05

6 Lamb-Shift Polarimeter layout
Ralf PST 05

7 ABS beam polarization measurements
Ly-α spectra of hydrogen and deuterium measured with LSP Ralf PST 05

8 How to measure polarization in the cell
ABS beam Target gas sample COSY beam Layout of the test setup at laboratory Ralf PST 05

9 LSP results Ralf PST 05

10 LSP results Ralf PST 05

11 How to measure polarization
Ralf PST 05

12 PIT at COSY hall Ralf PST 05

13 PIT transportation Ralf PST 05

14 ANKE Ralf PST 05

15 Polarized internal gas target setup at ANKE
ANKE Technical constraints Installation time of the PIT is limited to 3-4 days D2 is movable → needs sophisticated supporting bridge between D1 and D2 Tunnel width is limited → 60° angle between LSP components ABS axis is 50 cm away from D2 yoke → shielding from the stray field is needed Polarized internal gas target setup at ANKE ABS Storage cell Polarimeter Ralf PST 05

16 Stray field measurements
30 G 17 G 150 G 48 G 30 G measured field without shielding 17 G measured field with shielding x y z x y z 90 G 150 G 135 G 6 G 15 G 30 G 25 G 55 G 40 G 26 G 300 G 200 G 550 G 60 G 100 G 33 G 30 G maximum calculated field magnitude 45 G measured field magnitude 55 G allowed field for device Ralf PST 05

17 Polarization test with D2 field
Pz ~ 0.80 Ralf PST 05

18 Apertures tests at COSY
beam XY-table Frame with apertures Vacuum chamber Ralf PST 05

19 Principle of the apertures tests at COSY
1. Beam in the center of the aperture 50 mm 2. Aperture moves to the right until intensity drops +5 mm 3. Aperture moves to the left until intensity drops 11 mm Beam diameter = Aperture inner width - ( Distance Distance 3 ) Beam intensity is maximum Beam intensity starts to decrease Distance 2 Distance 2 Distance 3 Ralf PST 05

20 Estimated COSY-beam profile
36x16 mm x12 mm x15 mm with cluster target (density ~ 1014 at/cm2) no target at injection with an accelerated beam Ralf PST 05

21 Cell test preparation Aperture → 40 x 25 mm
Big cell → 30 x 20 x 220 mm entrance 600 mm2 Small cell → 15 x 15 x 220 mm entrance 225 mm2 Ralf PST 05

22 Results of the cell test
Tests were carried out with unpolarized hydrogen gas flux ~ 10-3 mbar l/s Target density for the large cell Ratio target/background for the large cell 9.4 * 1013 PRELIMINARY ~ 3 – 4 Injected deuterons large/small cell Estimated target density H2 for the small cell ~3 * 1014 ~ 7 – 8 No cooling of the ion beam !!! Ralf PST 05

23 Summary PIT moved to COSY hall since December 2004
PIT installed at ANKE in June-July 2005 PIT is running since September 2005 Cell tests without cooling in Spring 2005 Cell tests with electron cooling shifted to November 2005 LSP will be used to measure direct beam of the ABS Polarization in the cells determined by the Spectator counters Ralf PST 05

24 Polarized fusion Outlook
November ’05 – next cell tests with cooling and stacking of the COSY beam November ’05 – commissioning of the ABS-jet target at COSY Winter ’05-’06 – ANKE target exchange from PIT to Cluster target May ’06 – one more week for cell test at COSY Until June ‘06 – more tests with LSP in COSY hall new cell production with teflon coating ISTC project 1861 : “Measurement of the nuclear polarization in H2 / D2 molecules” Summer ’06 – PIT reinstallation at ANKE Autumn ’06 – first data production with jet target at ANKE ( Polarized fusion Ralf PST 05

25 ISTC project 1861 Ralf PST 05

26 Polarized fusion Ralf PST 05