IMCO’s excavations in the vicinity of Olympic’s pipeline.

Similar presentations


Presentation on theme: "IMCO’s excavations in the vicinity of Olympic’s pipeline."— Presentation transcript:

1

2 IMCO’s excavations in the vicinity of Olympic’s pipeline.

3 N

4 Design Phase Activities Locate Pipeline for Planning Obtain Olympic’s Requirements “Pothole” Pipeline

5 It is unlikely that the extensive damage to the pipeline occurred as a result of the potholing.

6 IMCO’s Excavation Activities

7 Location of gouged dents Olympic Pipeline Exposed During Water Line Installation 72" Line

8 Gouged Dents Found Near Water Line Crossing

9 Original Design

10 Modified Design

11 Tee New Discharge Line Newly-Installed Discharge Water Line

12 Rupture Tee Thrust Block

13 External Gouges on Ruptured Pipeline Area of Origin Gouge

14 Damage Shown on Internal Surface Rupture

15 Extent of Damage to Pipe

16 IMCO’s Excavation Activities Mechanized Equipment No Anomalies in 1991 Water Treatment Plant Project in 1993 and 1994 Anomalies Detected in 1996 and 1997

17 Damage to the Olympic pipeline probably occurred during IMCO excavations associated with the water treatment modification project.

18 New Discharge Line New Pump Station Newly-Installed Discharge Water Line Tee New Discharge Line

19 Olympic’s Inspections Olympic Not Notified of Excavations Barrett Should Have Notified Olympic of Design Change IMCO Responsible for Notification Olympic Didn’t Investigate Open Excavation or Check As-built Drawings

20 Olympic inadequately inspected the excavation work.