Presentation is loading. Please wait.

Presentation is loading. Please wait.

2010  LNL 5TC 2012  GSI/FRS 5TC+5DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA + VAMOS + EXOGAM2 FRS Total Eff. InFlight ~ 10% Total Eff.

Similar presentations


Presentation on theme: "2010  LNL 5TC 2012  GSI/FRS 5TC+5DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA + VAMOS + EXOGAM2 FRS Total Eff. InFlight ~ 10% Total Eff."— Presentation transcript:

1 2010  LNL 5TC 2012  GSI/FRS 5TC+5DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA + VAMOS + EXOGAM2 AGATA @ FRS Total Eff. InFlight ~ 10% Total Eff Nominal. ~ 14% Total Eff. CloseConfig ~6% AGATA@GANIL

2  Gamma-ray spectroscopy of very neutron-rich nuclei populated in Deep Inelastic collisions or induced fission using VAMOS to identify the reaction products in Q, A and Z.  Spectroscopy of heavy elements towards SHE and N=Z nuclei populated by fusion – evaporation with VAMOS in gas-filled mode.  Spectroscopy of p-rich nuclei at the N=Z line using the N-wall  Spectroscopy using existing and new SPIRAL1 beams GANIL physics cases  Ensuring these physics cases with the appropriate ancillaries detectors  The mechanical integration has to take into account this broad list of configurations

3  Charged particle array for transfer reaction MUST2/TIARA : (d,p) etc … program with SIB and RIB  Charged particle array for prompt tagging : DIAMANT  Neutron detector (Nwall)  Charged particle array for Recoil Decay Tagging : MUSETT  Scintillator : BaF2 array, LaBr3  Future detector : NEDA (n), GASPARD ( ?), PARIS (LaBr3) In G1 coupled to VAMOS (+ EXOGAM2): SIBs, RIBs AGATA 1  at GANIL : Ancillary devices At 0° as separator (vaccum/gas-filled) Angles >10 deg for fission & MNT Cryogenic target ? We ensure the coupling to AGATA through the VME AGAVA card

4

5

6 Salle G1 Détecteur AGATA + Mécanique Electronique EXOGAM Extension de plateforme Electronique AGATA Alimentation Haute et basse tension + Automate Azote liquide 300 Fibres optiques Connexion au réseau eau 26° 8 bars Connexion 27 kW 3* 220 litres LN2 Vers tank nord

7  Design done by STFC Daresbury in close collaboration with GANIL  An important work of integration is on-going  Final design review 1 st week of December  Projection T1 -2013  9 months of construction estimated On-going discussion with the IPHC workshop for the construction of the support Workshop for the extended plateform not yet defined I. Burrows (STFC) M. Ozille (GANIL)

8

9 M. Ozille, P. Grangnant, G. Fremont With plunger

10 I. Burrows (STFC) M. Ozille (GANIL)

11 AGATA improves the situation by a better equilibrium M. Ozille (GANIL)

12 I. Burrows (STFC) – G. Gaudiot (IPHC)

13

14 Processing room « 019 » L. Menager – M. Jean (GANIL)

15 TOTAL20132014 K€ Task N°11678285 Task N°226.5224.5 Task N°3161135 26 Task N°4150 Task N°510.70 Task N°90.5 0 TOTAL (k € ) 380.7239.5 141.2

16 ~150 k€ ~17k€ Processing room 019 Upgrade ~ 102k€ Detector lab infrastructure ~15 k€ Cryogenic upgrade, connection ~25 k€ Total investment cost ~380 k€ Optical fibers links ~70k€

17 Schedule (assuming that material from GSI arrive on Jan-Feb 2014 …………..) Gas-filled installation expected in mid-2015 GANISOL beam available for physics beginning of 2016 No SPIRAL1 beam in 2014-2015 We have requested the host of AGATA until end of 2016 T2-12T3-12T4-12T1-13T2-13T3-13T4-13T1-14T2-14T3-14T4-14…T4-16 Mechanics STFC Design GANIL Impl IPHC construc Mounting Infrastructure det GANIL Studies Collecting items Installation LN2, AF GANIL Studies Collecting items InstallationTest DAQ Hardware GANIL Studies Collecting items InstallationTest DAQ Software Preparatio n Test Processing Room Renov Aire Proj AGATA infra Detector Mounting Source & Commi Expt …

18 Budget : Total cost investment ~380k€ 237 k€ guaranteed by GANIL for 2013 to be completed in the 2014 request IPHC requested 90k€ from IN2P3 AP for the mechanic ANR (French Research Funding Agency) request for the gaz-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen et Ch. Schmitt) Loan of material from LNL & GSI (cooled cabinet, racks, water distribution, Optical link)

19 Performance simulations :on-going (final release expected February) Electronic coupling: on-going (several meeting already done or scheduled) Data flow, DAQon-going (several meeting already done or scheduled) Mechanic design : on-going (final design review) Optical link on-going (purchase order expected on April) Data analysis starting (first meeting on the first week of Dec.) AutoFill-cryogenic infrastarting (meeting with Saclay crew) Infrastructure on-going (needs identified, final design review on going) Local organization done (STP, BE, GAP,SPE, GVC already working) Task distribution done GANIL project method: Set of spec delivered, etc …. Installation description for DIRC01 : 1 st draft released to the QSE, risk analysis beginning of 2013 ~ 4ETP have worked in 2012 on the project ≈20 persons involved at GANIL ~80 h.mois pour 2013-2014 Collaboration : Local project manager : E.Clément Campaign spokesperson announced : S. Lenzi Call for LOI sent : dead line 8th February 2013 1 st workshop 18 th to 20 st of February organized at GANIL AGATA week 20-22 March at GANIL

20

21

22 Joa Ljungvall (CSNSM)

23 J. Ljungvall (CSNSM) for the AGATA collaboration - Preliminary × ~ 1.25 × ~ 1.5 AGATA nominal 233 mm EXOGAM nominal 145 mm Performance of the array

24  =12% More than efficiency, AGATA provides higher sensitivity × ~ 4.7 × ~ 12  performances under simulations

25

26

27

28 Beam: 238 U @ 5.5 MeV/u, (i ~ 2pnA) Target : 9 Be, 12 C, 48 Ca, 70 Zn, 198 Pt … (1 mg/cm 2 )  Full identification of the heavy recoil in VAMOS  Shell evolution toward 54 Ca (M. Rejmund et al )  lifetime measurement with a plunger in n-rich nuclei beyond 68 Ni ( J Ljungvall et al; A Dijon et al, I. Celikovic et al)  Delayed and prompt gamma spectroscopy around 68 Ni (A Dijon et al)  Transfer induced fission reactions (F. Farget et al, M. Rejmund et al. A. Görgen et al.)  Spectroscopy of heavy element Os (J. Valient-Dobon et al) EXOGAM coupled to VAMOS: Spectroscopy of n-rich nuclei

29 Vacuum mode : 22 Ne + 197 Au  214 Ac Gas filled mode : 48 Ca+ 198 Pt  244 Cf  VAMOS + EXOGAM+MUSETT  Vamos at 0 degree used as separator  Prompt spectroscopy after Recoil decay tagging (  -decay) in MUSETT MUSETT array EXOGAM coupled to VAMOS+MUSETT: Spectroscopy of SHE nuclei Not yet fully funded and operational  French grant Agency for Research 2013 request (Saclay -GANIL)  energy keV  energy keV

30 C. Schmitt et al NIM A 621 (2010) 558–565 VAMOS in gas-filled / Vacuum mode Rejection > 10 10 Measured in the 40 Ca+ 150 Sm reaction Unique opportunity to couple AGATA -1  with a separator in fusion induced reaction Prompt spectrocopy with  tagging at the focal plane (MUSETT) Spectroscopy beyond Fm: the shell model towards SHE

31 M. Sandzelius et al., Phys. Rev. Lett. 99, 022501 (2007). VAMOS in gas-filled with AGATA and MUSETT (Island of  -emitter) Onset of collectivity induced by np pairing near N=Z and closed shells ?  Prompt spectroscopy of light Xe,Te,I isotopes   and  emitter Gas filled mode : 54 Fe+ 54 Fe  106 Te +2n (25 nb) 54 Fe+ 58 Ni  110 Xe +2n (50 nb) 54 Fe+ 58 Ni  109 I +p2n (10  b) Collectivity in N≈Z nuclei: Enhancement from T=0?

32 J=9 Pd 46 92 J=9 J=7 92 Pd, exp. 92 Pd, SM 0+0+ 0+0+ (2 + ) (4 + ) (6 + ) 2+2+ 4+4+ 6+6+ 8+8+ 10 + 0 874 1786 2536 0 878 1708 2466 3127 4072 A new Spin-aligned pairing phase in 92 Pd B Cederwall, et al, Nature 469, 68-71 (2011) EXOGAM coupled to the NWall Prompt Spectroscopy of N=Z nuclei

33 J. Ljungvall (CSNSM) for the AGATA collaboration - Preliminary × ~ 1.25 × ~ 1.5 AGATA nominal 233 mm EXOGAM nominal 145 mm Performance of the array

34 Compatible VAMOS standard de 0 à 50 degres Compatible gas-filled 8 Targets Can be the support of a « wobbling » target What is not good : Charged particle detectors : DSSD, CUPS, DANTE etc … are difficult to insert Except if we modify the conic part of the chamber for not so close pack configuration

35 L’angle de 14° est une contrainte qui laisse un cône sans matière pour les détecteurs EXOGAM à 90°

36

37 Cible 15mm 30 mm ??


Download ppt "2010  LNL 5TC 2012  GSI/FRS 5TC+5DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA + VAMOS + EXOGAM2 FRS Total Eff. InFlight ~ 10% Total Eff."

Similar presentations


Ads by Google