Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Integrated Inspection Plan Marcel Stigter Policy Advisor DCMR.

Similar presentations


Presentation on theme: "Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Integrated Inspection Plan Marcel Stigter Policy Advisor DCMR."— Presentation transcript:

1 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Integrated Inspection Plan Marcel Stigter Policy Advisor DCMR

2 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 2 What is an integrated inspection plan? A multi disciplinary or thematic operational plan that contains at least: –objectives –procedure –time path –who is doing what –the way of reporting

3 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 3 Objectives What do you want to achieve? – Total transparency – Specific theme (safety, emissions ect.) – Identify violations – Combination

4 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 4 Procedure How to do it? –Compose the project team –Apoint a project leader –Sub projects by media or discipline –Inspection techniques –Matching and verification of results

5 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 5 Time path Think backwards when you make your time path: –When must the project be finalised –What results do you need for your report –What is the sequence of activities –When is who available/useable –How much time do you have/need –Evaluating points

6 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 6 Who is doing what? –Describe the responsibilities of every team member –Describe the task(s) of every team member –Describe the product(s) of every team member

7 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 7 The way of reporting Who will receive the results? –authorities/policy makers –inspection agency –public/ngo’s –the inspected companies

8 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 8 The way of reporting What can you do with the results? –planning of inspection priorities –policy making –enforcement of violations

9 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 9 The way of reporting How do you present the results of your project? –written document –press releases –presentation

10 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 10 Exercise Design an integrated inspection plan (project plan) for 2005 of RECTICEL Interiors CZ

11 Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 11 Pay attention to the following points: By the end of 2005 the whole installation must be transparent (input, throughput, output); There must be an approved agreement with a implementation time path between authorities and Recticel Interiors CZ at the end of 2005 about the results, improvements and correction of violations; The verification of the measurement reports, contracts and operational procedures which were sent to the authorities by Recticel Interiors CZ; You have to make a chapter describing how BAT is integrated in the whole process (input, throughput and output); Make a format for your annual report.