Presentation is loading. Please wait.

Presentation is loading. Please wait.

IDeaWorks- Good To Great – Program Hisham Al Zanoon July 5, 2012.

Similar presentations


Presentation on theme: "IDeaWorks- Good To Great – Program Hisham Al Zanoon July 5, 2012."— Presentation transcript:

1 iDeaWorks- Good To Great – Program Hisham Al Zanoon July 5, 2012

2 Objective of the Program Introduce efficiencies Increase effectiveness Improve the quality of work Increase students satisfaction Increase staff satisfaction Increase Industry partners satisfaction Be Compliance Ready for ISO and other…

3 Program Elements PDM Structured Process Agile/Scrum Approach Quality Assurance People Team Building Technical Mentoring Coaching

4 Quality PDM Process Project Validation Project Initiation Project Design Agile Develop ment Project Close Out

5 PDM Details PhasesINPUTPROCESSOUTPUTQAssurance Pre Inception1- Idea/Need 2- Stakeholders Acceptance Criteria 3) Project priorities 4) Constraints Project Validate 1) Preliminary Requirements 2) Statement of Work 3) Funding Approval 4) Project Charter 1) Risks Evaluation 2) Scope Boundaries Analysis 3) Deliverables Approvals Needed 4) Resources Limitations Inception1) Project CharterProject Initiation 1) Scope 2) Architecture 3) Detail Requirements & Stories Use cases 4) Project Plan 5) Release Engineering Setup 6) Initial Prototype 1) Risk Countermeasures 2) Deliverables Approvals 3) Status Reports 4) Requirements Matrix DB design standards 5) Architecture Design Standards 6) Requirements gathering Standards Elaboration1) Scope 2) Architecture 3) Detail Requirements Use cases 4) Project Plan 5) Release Engineering Setup 6) Initial Prototype Project Design1) Final Architecture 2) Detail 3) Specification 4) Database Design 5) Product Catalogue 6) Sprint Backlog 7) Prototype 8) Acceptance Test Cases 1) Deliverables Approvals 2) Status Reports 3) Project Design Review 4) Requirements Matrix 5) DB design standards 6) Architecture Design Standards 7) Requirements gathering Standards Construction1) Final Architecture 2) Detail 3) Specification 4) Database Design 5) Product Catalogue 6) Sprint Backlog 7) Prototype 8) Acceptance Test Cases Agile Scrum Development of Sprints 1) Increments of Deliverables 2) Final Product Deliverables 1) Deliverables Approvals 2) Status Reports 3) Code Reviews 4) Requirements Matrix 5) UI design standards 6) Testing and QA standards 7) Coding Standards Transition1) Final Product Deliverables 2) Project Contractual Documentation Project Close Out 1) Customer Signoff 2) Sponsor Signoff 3) Lessons learned 4) Close Out Report 1) Sponsor Feedback 2) Customer Feedback 3) iDeaWorks Feedback 4) Partners/Vendors Feedback

6 Q & A


Download ppt "IDeaWorks- Good To Great – Program Hisham Al Zanoon July 5, 2012."

Similar presentations


Ads by Google