The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams.

Similar presentations


Presentation on theme: "The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams."— Presentation transcript:

1 The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams

2  S-3A to be launched from Plesetsk cosmodrome: launch confirmed for 10 December 2015  Environmental and interfaces compatibility with Rockot successfully demonstrated during satellite environmental test campaign  Platform and payload ready: all tests done.  QAR successfully completed  Satellite transportation to Plesetsk has been booked, shipment beginning of November  Detailed planning of the Launch campaign is finalised, last details depending on final launch date definition Sentinel-3A Status

3 ESA & EUMETSAT SHARE OPERATIONS  EU Copernicus Regulation: full, open and free data policy, defining responsibilities for ESA and EUMETSAT and overall financial envelope  Dedicated EU-ESA and EU-EUMETSAT agreements

4 Archive and Offline Processing Centre Mission Performance Centre (MPC) Infoterra UK Farnboroug h Indra Madri d CLS Toulous e Eumetsat Darmstadt DLR Oberpfaffenho fen ACRI Nice CLS Brest READY FOR OPERATIONS ALL FACILITIES SUPPORTING S-3 GROUND SEGMENT ACTIVITIES ARE IN PLACE Stations: Data Acquisition and Near Real Time Product Generation: Data downlink, data processing (NRT and offline) For Sentinel-3: Svalbard Processing and Archiving Centres (PAC): perform the Sentinels’ systematic non-time-critical data processing, the on-the-fly data processing for specific cases and the reprocessing in case of processing algorithms or calibration parameters upgrades. For Sentinel-3: Archiving and offline processing centres – DLR for OLCI processing and archiving – CLS for SRAL processing and archiving – ACRI for SLSTR and S-3 synergy products processing and archiving EUMETSAT’s marine centre acts as PAC for marine products Missions Performance Centre (MPC): Operational Quality Control, Expert Support Laboratories (ESL), Calibration and Validation For Sentinel-3: consortium led by ACRI

5  Open and free access to all Sentinel data.  ESA Data dissemination infrastructure  For Sentinel-3 will follow same route as for other Sentinels (S-1, S- 2, S5P), with different access routes depending on user typology.  Is running successfully since October 2014;  The Copernicus Space Component Ground Segment data access is ensuring that all Sentinels core products are accessible to all users online.  Sentinel-3 data dissemination will be shared by ESA (Land products) and EUMETSAT (Marine products)  In addition, access to full Sentinels long- term archive will be made progressively available to all users online (when removing products from data hubs rolling archives) PROVIDING USERS WITH DATA sentinels.copernicus.eu

6 Sentinel-1 User and Data Statistics (“Scientific / Other Use” data hub) By 1 October 2015: 11,900 users registered on the scientific data hub 2.2 million products downloaded by users, representing 2.57 Petabytes of data Currently (6 October 2015) more than 276,000 products available for download

7 Preparations for commissioning phase are being finalised today Data products availability For commissioning phase teams only For validation team/ expert users; data release asap Level 1 data release, gradual ramp-up of operations and release of level 2 data products


Download ppt "The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams."