Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,

Similar presentations


Presentation on theme: "Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,"— Presentation transcript:

1

2 Haul Frames and Corners to the Jobsite

3 Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions, Wildlife, Rocks or debris in area to be lined

4 Visually Inspect the Equipment HAZARDS TO WATCH FOR : Broken Glass, Leaking Fuel / Hydraulic Line, Inspect Slings and Rig Equipment.

5 Install Proper Rigging on Track Hoe to Lay Out the Roll of Plastic Material HAZARDS TO WATCH FOR : Improper Operation of Equipment, Improper Rig Installation, Improper Rigging Material, Pinch Point at Rigging. ** MAKE SURE THERE ARE SAFETY SPOTTERS INVOLVED IN THIS STEP**

6 Lay Out the Cover Plastic Material HAZARDS TO WATCH FOR : Suspended Roll Hits Person, Equipment Hits Person, Equipment Cannot Handle Load. Watch out for slips, trips, and falls.

7 Lay Out the 6,000 lb Bull Rope HAZARDS TO WATCH FOR : Slip, Trip, or Fall.

8 Lay Out Roll of Plastic Material: 1st Piece Along Edge of Mark HAZARDS TO WATCH FOR : Suspended Roll Hits Person, Equipment Hits Person, Equipment Cannot Handle Load. Watch out for slips, trips, and falls. ** MAKE SURE THERE ARE SAFETY SPOTTERS INVOLVED IN THIS STEP**

9 Align Installers Along the Edge of the Plastic Material and Pull it Out HAZARDS TO WATCH FOR : Slip, Trip, or Fall. Watch out for open trench/sump.

10 Lay Out Roll of Plastic Material: 2 nd Piece Along Edge of 1st HAZARDS TO WATCH FOR : Suspended Roll Hits Person, Equipment Hits Person, Equipment Cannot Handle Load. Watch out for slips, trips, and falls. ** MAKE SURE THERE ARE SAFETY SPOTTERS INVOLVED IN THIS STEP**

11 Align Installers Along the Edge of the Plastic Material and Pull it Out HAZARDS TO WATCH FOR : Slip, Trip, or Fall. Watch out for open trench/sump.

12 (CONTINUE THE LAYOUT AND PULL OUT PROCESS UNTIL ALL ROLLS ARE INSTALLED- TRIM AND WELD EDGES OF PLASTIC)

13 Laying Out the Frames Align the Frames Along the Edge of the Plastic Material HAZARDS TO WATCH FOR : Slip, Trip, or Fall.

14 Secure the Frames Together With 6,000 lb Bull Tape HAZARDS TO WATCH FOR : Hit by a Mallet. Slip, Trip or Fall

15 Secure the Frames Together With 6,000 lb Bull Tape HAZARDS TO WATCH FOR : Hit by a Mallet. Slip, Trip or Fall

16 Secure the Frames Together With 6,000 lb Bull Tape HAZARDS TO WATCH FOR : Hit by a Mallet. Slip, Trip or Fall.

17 HAZARDS TO WATCH FOR : Slip, Trip or Fall. Power Tools Hitting Hands. Building the 3 Side Walls - Flip the Frames and Attach the Plastic Material with Clips

18 HAZARDS TO WATCH FOR : Slip, Trip or Fall. Power Tools Hitting Hands.

19 Building the 3 Side Walls - Flip the Frames and Attach the Plastic Material with Clips HAZARDS TO WATCH FOR : Slip, Trip or Fall. Hands Getting Caught in Frames.

20 HAZARDS TO WATCH FOR : Slip, Trip or Fall. Hands Getting Caught in Frames. Building the 3 Side Walls - Flip the Frames and Attach the Plastic Material with Clips

21 Examine the Three Wall Sides and all Clips

22 Three Wall Sides Completed

23 Lay Out the Textured Plastic Material HAZARDS TO WATCH FOR : Slip, Trip, Fall.

24 Install the Textured Liner Material HAZARDS TO WATCH FOR : Cut by Open Blade. Slip, Trip, or Fall. Watch for trench/sump mark.

25 Install the Textured Liner Material HAZARDS TO WATCH FOR : Cut by Open Blade. Slip, Trip, or Fall. Watch for trench/sump mark.

26 Extruding of Plastic Material HAZARDS TO WATCH FOR : Cut by Open Blade. Slip, Trip, or Fall.

27 Tanks are then Transported onto the Containment Site HAZARDS TO WATCH FOR : MAKE SURE THERE ARE SAFETY SPOTTERS FOR THIS STEP.

28 Final Wall Close Up (Same Frame Installation Procedure as Before)

29

30

31 Final Close Up Examination & Finishing Touches

32

33 Murphy Containment Pit- Final