April 5, 2007 Networks Integration Management Office Mission Support Process Networks Integration Management Office; Code 450.1.

Similar presentations


Presentation on theme: "April 5, 2007 Networks Integration Management Office Mission Support Process Networks Integration Management Office; Code 450.1."— Presentation transcript:

1 April 5, 2007 Networks Integration Management Office Mission Support Process Networks Integration Management Office; Code 450.1

2 Page 2 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE Network Integration Management Office Functions The Network Integration Management Office (NIMO) provides its spacecraft and scientific customers with a complement of mission services. The group provides best value tracking and data acquisition options, assistance with mission-unique communications requirements, and assistance in requirements definition. The NIMO provides Principal Investigators and Mission Formulation Managers with options and planning assistance to effectively meet the mission tracking and data acquisition (T&DA) needs. The NIMO also supports the mission throughout the life cycle for its T&DA needs - from trade studies and cost analysis during the formulation phase, to project management during development and operations. In addition, the NIMO provides Network Integration Managers (NIM) with the ability to secure contract vehicles and services to implement and operate their mission most effectively.

3 Page 3 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Personnel & Assignments Direct Civil Servants Leslie Ambrose – Space Science Mark Ambrose – Agreements & Reimbursable Manager Jim Bangerter – Human Space Flight Evette Brown-Conwell – ELV Dick Harris – Contracts Al Levine – Loading & Feasibility Lynn Myers – Earth Sciences Tammy Wang – Resource Analyst Matrixed Civil Servants John Weiss – Estimation Dick Nefzger – Video YY Bae – Compatibility Chris Schwartz – L&F & ELV

4 Page 4 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE Networks Integration Manager (NIM) Assignments

5 Page 5 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Access Methods Projects Proposal Teams TelephoneE-mailWalk in NIMO

6 Page 6 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE External Interface to the Infrastructure ESCD GSFC Space Network Ground Network Lunar Network NISN Flight Dyn. Fac. Deep Space Net NIMO NASA Non-NASA NASA

7 Page 7 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Major Process Steps

8 Page 8 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Major Process Steps Details - Example

9 Page 9 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Mission Process Products Memorandum of Agreement Visibility and Loading Analysis - 1 Project Support Level Agreement Visibility and Loading Analysis - 2 Networks Requirements Document Networks Requirements Review Radio Frequency ICD Compatibility Test Plan Test Quick Look Report Final Report Compat. Test Review Customer Integration Test Plan Testing Network Operations Support Plan Customer Data Flows & Simulations Visibility and Loading Analysis - 3 Mission Operations Readiness Review Mission Operations Post Launch Report/Lessons Learned The NIMO mission development process exists, and is constructed, to assure, to the maximum extent possible, communications connectivity and data delivery to every mission on every contact.

10 Page 10 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Process Timeline

11 Page 11 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE Backup

12 Page 12 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Process Flow (cont.)

13 Page 13 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO Process Flow (cont.)

14 Page 14 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO PSLA Contents (Present) Section A. Customer Information Section B. Customer Requirements and Standard Services B.1GSFC Networks/Data Services B.1.1Ground Network Services B.1.1.1Customer Requirements B.1.1.2Services Provided B.1.2Space Network (SN) Services B.1.2.1Customer Requirements B.1.2.2SN Data Formatting and Interface B.1.2.3Services Provided B.1.3Customer Integration and Test B.1.4Satellite Laser Ranging (SLR) Services B.1.5Radio Frequency (RF) Interface Control Document (ICD) B.2Deep Space Network (DSN) Services B.3Flight Dynamics Services B.3.1Customer Requirements B.3.2Services Provided B.4Range Services – Not Applicable B.5NASA Integrated Services Network (NISN) Services Section C. Unique Customer Requirements for Non- Standard Services Section D. Service and Schedule Summary D.1Funding Responsibility D.2Estimated Services for Future Years Section E. Projected Documentation Set

15 Page 15 NIMO MSR (September 1 – September 30, 2006) NETWORKS INTEGRATION MANAGEMENT OFFICE NIMO PSLA Contents (Future) SECTION A. Customer Information SECTION B. Customer Requirements And Standard Services B.1GSFC Networks/Data Services B.1.1Ground Network Services B.1.2Space Network Services B.1.3Customer Integration And Test B.1.4Satellite Laser Ranging (SLR) Services B.1.5Radio Frequency (RF) Interface Control Document (ICD) B.2Deep Space Network (DSN) Services B.3Flight Dynamics Services B.4Range Services B.5NASA Integrated Services Network (NISN) Services SECTION C. Unique Customer Requirements For Non-Standard Services C.1AFSCN Requirements SECTION D. Service And Schedule Summary D.1Funding Responsibility D.2Estimated Services For Future Years D.2.1Project Schedule SECTION E. Network Integration Documentation Set