Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –

Similar presentations


Presentation on theme: "Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –"— Presentation transcript:

1 Elevating the Quality of Life in the District

2 Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE – AUGUST 2015 TO APRIL 2016  TIMELINE – EASTER BREAK 2016  TIMELINE – APRIL 2016 TO JULY 2016  ACCESS & FLOW  Foundation to Grade Building Permit  Building Permit  NEXT STEPS  18 th Nov. to 2 nd Dec. Activities two week look ahead.  Construction Images in Courtyard  Construction Milestone  Frequently Asked Questions.  Q & A Elevating the Quality of Life in the District

3 RULES OF THE ROAD  RESPECT EACH OTHER  CELLPHONES OFF OR ON VIBRATE  Q&A WILL BE TAKEN AT THE END OF THE PRESENTATION

4 Elevating the Quality of Life in the District

5 AFTER RENOVATION BEFORE RENOVATION

6 Elevating the Quality of Life in the District AFTER RENOVATION BEFORE RENOVATION

7 Elevating the Quality of Life in the District BEFORE RENOVATION AFTER RENOVATION

8 Elevating the Quality of Life in the District AFTER RENOVATION BEFORE RENOVATION

9 Elevating the Quality of Life in the District BEFORE RENOVATION AFTER RENOVATION

10 Elevating the Quality of Life in the District SECTIONS

11 Elevating the Quality of Life in the District

12

13 CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015

14 Elevating the Quality of Life in the District

15 CONSTRUCTION STRATEGY  TIMELINE – AUGUST 2015 TO APRIL 2016

16 Elevating the Quality of Life in the District

17 TIMELINE AUGUST 2015 – APRIL 2016 UNDER CONSTRUCTION EGRESS DURING CONSTRUCTION LOGISTICS AND PHASING PLAN ARE CONTINENT UPON OBTAINING PERMITS AND DOEE APPROVALS PER TURNER’S SCHEDULE

18 Elevating the Quality of Life in the District CONSTRUCTION STRATEGY  TIMELINE – EASTER BREAK 2016

19 Elevating the Quality of Life in the District TIMELINE EASTER BREAK 2016 UNDER CONSTRUCTION LOGISTICS AND PHASING PLAN ARE CONTINENT UPON OBTAINING PERMITS AND DOEE APPROVALS PER TURNER’S SCHEDULE

20 Elevating the Quality of Life in the District CONSTRUCTION STRATEGY  TIMELINE – APRIL 2016 TO JULY 2016

21 Elevating the Quality of Life in the District

22 TIMELINE APRIL 2016 – JULY 2016 UNDER CONSTRUCTION EGRESS DURING CONSTRUCTION LOGISTICS AND PHASING PLAN ARE CONTINENT UPON OBTAINING PERMITS AND DOEE APPROVALS PER TURNER’S SCHEDULE

23 Elevating the Quality of Life in the District TWO CREPE MYRTLE TREES WILL BE RELOCATED 1 2

24 Excavation & Demo in Courtyard

25

26

27 Installation of Foundation System & Elevator Pit in Courtyard

28 Erection of Structural Steel in Cafeteria & Roof of 1956 Building

29 Elevating the Quality of Life in the District TWO CREPE MYRTLE TREES WILL BE RELOCATED 1 2

30 Infiltration System Impact Crepe Myrtle Trees in Images

31 Elevating the Quality of Life in the District CONSTRUCTION MILESTONE  COMMENCEMENT OF CONCRETE WORK; OCTOBER  COMMENCEMENT OF ELEVATOR SHAFT; NOVEMBER  COMMENCEMENT OF COURTYARD STRUCTURAL STEEL; DECEMBER

32 Shepherd ES Logo in Courtyard

33 Frequently Asked Questions 1. Will the asphalt area on the playground be repaired or replaced? Answer:- The asphalt will be repaired. 2. The Mural on the concrete wall will not be impacted by the construction Activities.

34 Elevating the Quality of Life in the District NEXT STEPS TWO WEEK LOOK AHEAD  EXCAVATION IN COURTYARD  FORMING & INSTALLATION OF FOUNDATION SYSTEM IN COURTYARD  ERECTION OF STRUCTURAL STEEL IN THE 1956 BUILDING

35 Kenneth Diggs DGS Associate Director DGS Government Affairs & Communications kenneth.diggs@dc.gov (202) 580-9361 Elevating the Quality of Life in the District