Presentation is loading. Please wait.

Presentation is loading. Please wait.

Alpine Technical Delegates Update 2008 1 INTERNATIONAL SKI FEDERATION Timing & Data Technical Report Form Version 7.1.

Similar presentations


Presentation on theme: "Alpine Technical Delegates Update 2008 1 INTERNATIONAL SKI FEDERATION Timing & Data Technical Report Form Version 7.1."— Presentation transcript:

1 Alpine Technical Delegates Update 2008 1 INTERNATIONAL SKI FEDERATION Timing & Data Technical Report Form Version 7.1

2 Alpine Technical Delegates Update 2008 2 Timing & Data Technical Report

3 Alpine Technical Delegates Update 2008 3 Codex or Race Code Event Gender CODEX Note the “check boxes”

4 Alpine Technical Delegates Update 2008 4 Race Site and State Nation Event Name Date (dd/mm/yy) Location

5 Alpine Technical Delegates Update 2008 5 Equipment Sys Timer A Sys Timer B Start Gate Finish Cell A Finish Cell B Brand Name Model or Type Serial Number Homologation #

6 Alpine Technical Delegates Update 2008 6 Equipment Timers Brand Model Serial No. Homol. # TAG HEUER PTB 605 388 TAG.005.97

7 Alpine Technical Delegates Update 2008 7 Equipment Start Gate Brand Model Serial No. Homol. # TAG HEUER HL 7.1 196 TAG.S54.03

8 Alpine Technical Delegates Update 2008 8 Equipment Photo Cells Brand Model Serial No. Homol. # TAG HEUER HL.7.1 196 TAG.S54.03

9 Alpine Technical Delegates Update 2008 9 Software Software & Results Preparation Brand Version Date Results= Tapes Split Second National/FIS Rev. 1- 3/08 Confirmed

10 Alpine Technical Delegates Update 2008 10 Connections How do we communicate signals/data from Start to Finish? How is voice communication handled between Start and Finish? Cable Radio Snowmobile Ski Lift Skier ??

11 Alpine Technical Delegates Update 2008 11 Warm-up and Synchronization At what time is the run scheduled to start? --Is there a rule about Synchronization? --What is the minimum recommended warm up time? Is there a Maximum?

12 Alpine Technical Delegates Update 2008 12 Synchronization and Synch + 1 Minute Are Systems A and B synchronized? –How close are they? What is the maximum difference acceptable? –So what? What about Hand Times? –So what?


Download ppt "Alpine Technical Delegates Update 2008 1 INTERNATIONAL SKI FEDERATION Timing & Data Technical Report Form Version 7.1."

Similar presentations


Ads by Google