1 HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453

2 HiRadMat remainder HRM-TB 2. Feb. 2015A. Fabich2 HRMT 10 – WTHIMBLE – Preparing for PIE HRMT 14 – LCMAT – Exp. Cubicle hosted in build 954 – Mobile table 02 to be recuperated – Use again for HRMT23 HRMT 09 – LCOL – Exp. Cubicle hosted in build 954 – Mobile table 02 to be recuperated, to be returned to HRM HRMT 12 – LPROT – Hosted in TNC – cool-down – Recuperated “today” – EDMS 1471655 – Table 04 returned to HiRadMat WANF blocks – Disposal scheduled January 2016 – Preparations to be discussed with DGS/RP now

3 Feed-throughs - status Infrastructure installation removed – (water cooled) cabling – Water piping – Cable trays Drilling w7-8, completed until 19 th Feb. 2015 Cabling between TNC and TT61 – NE48 x 6 – Additional star point in TT61 – Electricity available – ? Specifications of the transparent feed-through window? – Additional users’ needs? submit to hiradmat.sps@cern.ch for optimisationhiradmat.sps@cern.ch 6/2/2015A. Fabich3

4 Demin. water Nous avons 35kW de puissance de refroidissement disponible au niveau des tables avec un débit max de 3m3/h à 27°C. Nous pouvons avoir une pression max à l’entrée de la table à 9 bars. 6/2/2015A. Fabich4

5 HiRadMat beam times in 2014/2015 6/2/2015A. Fabich5 15 proposals received – including 2 parasitic experiments – HiRadMat Scientific And Technical Committee 9 proposals fully approved Proposals received most recently will be reviewed in the coming months Accumulated SPS cycle time 2012: 48 hours 2014: 8 hours (estimate) 2015: 75 hours (estimate) BLM TPSG4 GlassyC windows BPM diamond Berrylium samples Supra sextupole Collimator jaws Rotating collimator AD target UA9 crystal Microphone High power target Fiber BLM TDI Collimator materials

6 Proposals 6/2/2015A. Fabich6

7 6/2/2015A. Fabich7 7 HRM slots Every 4-5 weeks

8 Scheduling 6/2/2015A. Fabich8 Slots every 4-5 weeks – limited by RP aspects – HRM personnel resources Overall interest being scheduled end 2015 – Highest intensities available – Readiness of experimental HW

9 Assigned beam slots 6/2/2015A. Fabich9 confirmed

10 HRM-TB 2. Feb. 2015A. Fabich10

11 Users’ BPM 6/2/2015A. Fabich11 Requested so far by – proposal 1409 – RodTarg – HRMT24 – BeGrid – proposal 1420 TCDI/TDI – Proposal 1410 - UA9

12 BPM requirements 6/2/2015A. Fabich12 ABSOLUTE beam position ~0.1 mm – wrt to experimental setup (metrology) – As close as possible to the experimental setup – just upstream – Integrated in an (typical) experimental setup – on the mobile table ONLINE Single bunch resolution In the full range of the beam parameter space 1-288 bunches/pulse 10 10 -10 11 ppb Provision/maintenance by BE/BI based on standard equipment/procedures Available by August 2015 for commissioning Write-up to be discussed in week Requirements will be presented to BI techn. Board on 19 th Feb.