HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.

Similar presentations


Presentation on theme: "HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal."— Presentation transcript:

1 HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal for next weeks AOC or work notification ? Agenda

2 Worksite : activities in progress (W1&2) January 15, 2010S. Evrard 2 B846 access control 2/3 completed (cabling and new grid door OK, PLC upgrade in week 3) Furet dismantled RIA installed, hoses box to be fixed TT61 cleaned, shielding blocks (TCX) ready for installation TNC re-lighting done

3 WANF cleaning January 15, 2010S. Evrard 3 Work procedure and dose estimate received and validated with DG/SCR Team of 4 tech. @ Cern today: paper work and VIC achieved Cleaning in W3

4 Proposal for 4-5-6 S. Evrard 4 Remove as much as possible during monthly LHC technical stops (outlined area). MTR’s and T1 target during LHC shutdown (need to remove TI2 line  investigation in progress T1 dismantling January 15, 2010

5 Proposal for W4 S. Evrard 5 Survey network points 8 drilling operations to be carried out by GS/SEM January 15, 2010

6 Proposal for 4-5-6 S. Evrard 6 Removal of old AHU in TA7 Could be achieved on CV small works contractor January 15, 2010

7 Proposal for 4-5-6 S. Evrard 7 Removal of beam line equipment from TNC 2 magnets Beam instrumentation January 15, 2010

8 Proposal for 4-5-6 S. Evrard 8 Other activities Red telephone in TNC (F. Schmitt) Pas de câble de ce type en stock au CERN, un mois nécessaire pour approvisionner, F. Schmitt fera propositions palliatives lors de la réunion (tél. normal en TNC ?). Fire detection removal in TNC. (D. Raffourt) Crane crémaillère check (A. Calderone) January 15, 2010