Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 1 802.15 51st Session of meetings of the IEEE 802.15 Working Group for Wireless.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 1 802.15 51st Session of meetings of the IEEE 802.15 Working Group for Wireless."— Presentation transcript:

1 doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 1 802.15 51st Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks November 11-16, 2007 Hyatt Regency 265 Peachtree Street NE Atlanta, GA 30303, USA

2 doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 2 802.15 Organization Chart To add your name to the WG/SG/TG reflectors please go to www.ieee802.org/15www.ieee802.org/15

3 doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 3 Objectives of the Atlanta Session November 11-16, 2007 TASK GROUP 3c –mmWave PHY for 15.3 1.Presentaion of merged Proposal 2.Confirmation of merged Proposal 3.Organize drafting effort STUDY GROUP 4c Alternate PHY layer: 1.CWPAN Status/Update and Next Steps 2.Hear Proposals/Updates 3.Next Steps & Timeline

4 doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 4 TASK GROUP 4D Alternate PHY layer: 1.Japanese Regulatory Status Update and presentation of draft regulations 2.Discussion and Comment on Draft 3.Prepare supplementary information for Call for Proposals TASK GROUP 5 –Mesh Networking: 1.Technical Presentations & Discussions 2.Finalizing Draft for WG letter ballot 3.Election of Editor 4.Discussion of project plan Objectives of the Atlanta Session November 11-16, 2007

5 doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 5 STUDY GROUP-Body Area Networks 1.Gain EC approval on PAR and 5C documents 2.Work on Applications, Channel Model and TR documents 3.Refine Project Timeline STUDY GROUP-4e MAC Enhancements 1.Gain EC approval on PAR and 5C documents 2.Refine Project Timeline Objectives of the Atlanta Session November 11-16, 2007

6 doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 6 INTEREST GROUP-RFID 1.Develop Objectives 2.Identify groups that should be contacted to participate NEW PROJECTS SUBCOMMITTEE 1.Report on sub-group progress 2.New presentations Objectives of the Atlanta Session November 11-16, 2007

7 doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 7

8 doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 8 Upcoming Sessions January, 13-18, 2008, Howard Hotel, Taipei, Interim March 16-21, 2007, Caribe Royale Resort, Orlando, FL, USA, 802 Plenary Meeting. May 11-16, 2008, Hyatt, Jacksonville, FL, Interim July 13-18, 2008, Hyatt Regency Denver at the Colorado Convention Center Denver, Colorado USA, 802 Plenary Meeting. Sept 7-12, 2008, Hilton Waikoloa Villiage, Big Island, HI, USA Interim


Download ppt "Doc.: IEEE 802.15-07-0902-00 Submission November 2007 Robert F. HeileSlide 1 802.15 51st Session of meetings of the IEEE 802.15 Working Group for Wireless."

Similar presentations


Ads by Google