Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE 802.15 Working Group for.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE 802.15 Working Group for."— Presentation transcript:

1 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks March 13-18, 2011 Marina Bay Sands Hotel, Singapore

2 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 2 802.15 Organization Chart To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15www.ieee802.org/15

3 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 3 Singapore Session Objectives March 13-18, 2011 TASK GROUP4e --MAC Enhancements 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation TASK GROUP-4f Active RFID 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Seek Conditional Approval to start Sponsor Ballot TASK GROUP-4g Smart Utility Networks 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Evaluate Timeline TASK GROUP-4h 15.4-2006 Corrigendum 1 1.On-Hold pending completion of 15.4i

4 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 4 Singapore Session Objectives March 13-18, 2011 TASK GROUP-4i 15.4-Roll up of a, c, and d 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Seek Conditional Approval to Submit to RevCom TASK GROUP-4j MBAN Phy Amendment 1.Review responses to CFA 2.Develop Project Plan/Timeline TASK GROUP-4k Low Energy Critical Infrastructure Monitoring 1.Confirm a Chair for the Group 2.Review responses to CFA 3.Develop Project Plan/Timeline

5 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 5 Singapore Session Objectives March 13-18, 2011 TASK GROUP 6 –Body Area Networking: 1.Complete Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Update Project Timeline TASK GROUP 7-VISIBLE LIGHT COMMUNICATIONS 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Seek approval of editorial PAR edits to Scope 4.Seek conditional approval for RevCom

6 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 6 Singapore Session Objectives March 13-18, 2011 Study Group: Personal Space Communication (PSC) 1.Seek approval of PAR and 5C 2.Conduct 802 Tutorial 3.Discuss future of the Committee Study Group: TV White Space PHY for 15.4 (4TV) 1.Create draft of PAR and 5C 2.Discuss future of the Committee

7 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 7 Singapore Session Objectives March 13-18, 2011 Host Identity Protocol (HIP) Interest Group: 1.Not Meeting in Singapore Spectrum Resource Use (SRU) Interest Group: 1.Hear Contributions 2.Discuss future of the Committee THz Interest Group: 1.Hear Contributions 2.Discuss future of the Committee

8 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 8 NEW PROJECTS SUBCOMMITTEE 1.Report on WNG progress 2.Hear new presentations Working Group Rules Committee 1.Comment resolution on Ops Manual 2.Adopt generic WG rules Singapore Session Objectives March 13-18, 2011

9 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 9

10 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 10 Upcoming Sessions May 8-13, 2011, Hyatt Grand Champion, Palm Springs, California, USA, 802 Wireless Interim July 17-22, 2011, Hyatt Regency San Francisco at Embarcadero Center, San Francisco, CA, USA, 802 Plenary Session. September 18-23, 2011, Okinawa Convention Center, Okinawa, Japan, 802 Wireless Interim November 6-11, 2011, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Plenary Session. January 15-20, 2012, Hyatt Regency, Jacksonville, Florida, USA, 802 Wireless Interim March 11-16, 2012, Melbourne or Big Island-TBD, 802 Plenary Session. May 13-18, 2012, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Wireless Interim Session July 15-20, 2012, Grand Hyatt Manchester, San Diego, CA, USA, 802 Plenary Session. September 9-14, 2012, Hilton Waikoloa Village, Big Island, HI, USA, 802 Wireless Interim Session November 11-16, 2012, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session.

11 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 11 Okinawa CC- Aerial View

12 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 12 Okinawa Hotel Locations

13 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 13 Hotel Rates-approximate Laguna Gardens (185 Rooms) –19,500 & 20,500 Yen incl Breakfast Moon Ocean (80 Rooms) –22,500 Yen incl Breakfast Japanese Style Hotel (30 Rooms) –16,000 Yen Naha Options available for 12,000- 16,000 but not recommended

14 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 14 Hotel Booking Process Bookings handled by Nippon Travel Agency- Okinawa-They hold a no Risk Block An IEEE specific link will be provided as part of the web registration. No deposit required at time of booking BUT, full amount will be charged 21 days in advance of arrival Block will be held until July 20 when 40% will be released with an additional 20% on Aug 20 Booking before July 20 is STRONGLY encouraged. Unless you are Japanese, staying in Naha would be a challenge.

15 doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 15 Hotel Cancellation Policy >21 days: No Cancellation Charge Day 21: Credit Card is charged 20-14 days: 10% of stay 13-7 days: 20% of stay 6-3 days: 50% of stay <3 days: 100% of stay Modifications to Bookings follows the same pattern except time is measured back from the day you wish to change & the value is the value of that night. So, If I booked for 8 days and want leave a day early and notify the hotel at check in, I would pay 20% of the cost of that night.


Download ppt "Doc.: IEEE 802.15-11-0203-01 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE 802.15 Working Group for."

Similar presentations


Ads by Google