Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE 802.15 Working Group for.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE 802.15 Working Group for."— Presentation transcript:

1 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks March 13-18, 2011 Marina Bay Sands Hotel, Singapore

2 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 2 802.15 Organization Chart To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15www.ieee802.org/15

3 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 3 Singapore Session Objectives March 13-18, 2011 TASK GROUP4e --MAC Enhancements 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation TASK GROUP-4f Active RFID 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Seek Conditional Approval to start Sponsor Ballot TASK GROUP-4g Smart Utility Networks 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Evaluate Timeline TASK GROUP-4h 15.4-2006 Corrigendum 1 1.On-Hold pending completion of 15.4i

4 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 4 Singapore Session Objectives March 13-18, 2011 TASK GROUP-4i 15.4-Roll up of a, c, and d 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Seek Conditional Approval to Submit to RevCom TASK GROUP-4j MBAN Phy Amendment 1.Review responses to CFA 2.Develop Project Plan/Timeline TASK GROUP-4k Low Energy Critical Infrastructure Monitoring 1.Confirm a Chair for the Group 2.Review responses to CFA 3.Develop Project Plan/Timeline

5 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 5 Singapore Session Objectives March 13-18, 2011 TASK GROUP 6 –Body Area Networking: 1.Complete Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Update Project Timeline TASK GROUP 7-VISIBLE LIGHT COMMUNICATIONS 1.Comment resolution on last Recirculation 2.Prepare draft for next Recirculation 3.Seek approval of editorial PAR edits to Scope 4.Seek conditional approval for RevCom

6 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 6 Singapore Session Objectives March 13-18, 2011 Study Group: Personal Space Communication (PSC) 1.Seek approval of PAR and 5C 2.Conduct 802 Tutorial 3.Discuss future of the Committee Study Group: TV White Space PHY for 15.4 (4TV) 1.Create draft of PAR and 5C 2.Discuss future of the Committee

7 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 7 Singapore Session Objectives March 13-18, 2011 Host Identity Protocol (HIP) Interest Group: 1.Not Meeting in Singapore Spectrum Resource Use (SRU) Interest Group: 1.Hear Contributions 2.Discuss future of the Committee THz Interest Group: 1.Hear Contributions 2.Discuss future of the Committee

8 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 8 NEW PROJECTS SUBCOMMITTEE 1.Report on WNG progress 2.Hear new presentations Working Group Rules Committee 1.Comment resolution on Ops Manual 2.Adopt generic WG rules Singapore Session Objectives March 13-18, 2011

9 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 9

10 doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 10 Upcoming Sessions May 8-13, 2011, Hyatt Grand Champion, Palm Springs, California, USA, 802 Wireless Interim July 17-22, 2011, Hyatt Regency San Francisco at Embarcadero Center, San Francisco, CA, USA, 802 Plenary Session. September 18-23, 2011, Okinawa Convention Center, Okinawa, Japan, 802 Wireless Interim November 6-11, 2011, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Plenary Session. January 15-20, 2012, Hyatt Regency, Jacksonville, Florida, USA, 802 Wireless Interim March 11-16, 2012, Melbourne or Big Island-TBD, 802 Plenary Session. May 13-18, 2012, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Wireless Interim Session July 15-20, 2012, Grand Hyatt Manchester, San Diego, CA, USA, 802 Plenary Session. September 9-14, 2012, Hilton Waikoloa Village, Big Island, HI, USA, 802 Wireless Interim Session November 11-16, 2012, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session.


Download ppt "Doc.: IEEE 802.15-11-0203-00 Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE 802.15 Working Group for."

Similar presentations


Ads by Google