Presentation is loading. Please wait.

Presentation is loading. Please wait.

7 April, 2008 Bernard Longhi / TBG6 / TBG6 (AEC Gp) Architecture – Engineering - Construction Chair: Bernard Longhi.

Similar presentations


Presentation on theme: "7 April, 2008 Bernard Longhi / TBG6 / TBG6 (AEC Gp) Architecture – Engineering - Construction Chair: Bernard Longhi."— Presentation transcript:

1 7 April, 2008 Bernard Longhi / TBG6 / bernard.longhi@blc-consultants.com TBG6 (AEC Gp) Architecture – Engineering - Construction Chair: Bernard Longhi Vice-Chair: Jun-Ichi Yamashita Vice-Chair: Chris Hassler Opening Plenary Mexico, April 7th, 2008

2 7 April, 2008TBG6 / Bernard Longhi 5 TBG6/TBG1 PROJECTS ON GOING eCatalog Project, hosted by TBG1 eTendering Project (Public and private Procurement) Project Schedule and Cost Performance Management Contract Financial Execution Management Security for documents and messages, hosted by TBG6, but intersectorial project for all TBGs TBG6 attendees in Mexico: Participants coming from France, India, Japan, United States… TBG6 (AEC Gp) Architecture – Engineering - Construction

3 7 April, 2008TBG6 / Bernard Longhi Life cycle of public procurement Design / Estimation Design / Estimation Tendering Project Management Maintenance Procurement / Strategy Contract eTendering CFEM PSCPM Design and Estimation ・・・ Not Yet. Tendering ・・・ e-Tendering ebXML Standards for BoQs/Princing doc exchanges Contract and Finance ・・・ Contract Financial Execution Management: Initial Contract documents and Invoices Project Mgt ・・・ Project Schedule and Cost Performance Management Project: not yet Maintenance ・・・ Not Yet. Not Yet!

4 7 April, 2008TBG6 / Bernard Longhi TBG6 Standards Progress BRS RSM SCHEMAS eTenderingPSCPMCFEMSecurity Candidate Release Full UN/Cefact Standard (D07A): Monday 17 March 2008

5 7 April, 2008TBG6 / Bernard Longhi TBG1-TBG6 joint projects Public and private Procurements projects For a global set of ebXML standards to meet user requirements eTendering Project Schedule and Cost Performance Management Contract Financial Execution Management Quotation Catalogues OrderingDelivering Invoicing Payment Process Supply chain – Trade messages – TBG1 Contract and Project Management – TBG6 Scheduling Security

6 7 April, 2008TBG6 / Bernard Longhi eTendering Project (Public and private Procurement) And TBG6 (AEC Gp) Architecture – Engineering - Construction entering maintenance phase publication ? Project Schedule and Cost Performance Management

7 7 April, 2008TBG6 / Bernard Longhi TBG6 (AEC Gp) Architecture – Engineering - Construction Contract Financial Execution Management Requirements Model produced through the recent work groups will be made available as a working document on the TBG6 website. Other stakeholder’s groups have been invited to contribute, such as TBG 5 for payment process and TBG 19 for specific public issues. Invitations were open until mid June 2007……?! Contact will be maintained with TBG 14 and MRI to ensure compliance with the UMM and to assist the improvement of the production process.

8 7 April, 2008TBG6 / Bernard Longhi TBG6 (AEC Gp) Architecture – Engineering - Construction Security for documents and messages Project leader is Sujeet Bhatt (India) and project editor Peter L. Borresen (DK) The document has be updated by the project leader and editor. Basis for this week work

9 7 April, 2008TBG6 / Bernard Longhi TBG6 (AEC Gp) Architecture – Engineering - Construction Coordination and cross participations  Participation in MRI meeting (on the 6 th)  Security Project: Tuesday afternoon  ebXML Standards Maintenance Question: all TBGs invited Wednesday afternoon, after coffee break  Steering Committee for Joint project on ePP (TBG 1, 6 and 19): Wednesday, 17:00 – 18:00  Joint Meeting with TBG1: Thursday morning (11:30)


Download ppt "7 April, 2008 Bernard Longhi / TBG6 / TBG6 (AEC Gp) Architecture – Engineering - Construction Chair: Bernard Longhi."

Similar presentations


Ads by Google