Presentation is loading. Please wait.

Presentation is loading. Please wait.

Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME WELCOME POSIPOL 2007 Goals Alessandro Variola MAY 23 rd 2007 Posipol Welcome.

Similar presentations


Presentation on theme: "Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME WELCOME POSIPOL 2007 Goals Alessandro Variola MAY 23 rd 2007 Posipol Welcome."— Presentation transcript:

1 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME WELCOME POSIPOL 2007 Goals Alessandro Variola MAY 23 rd 2007 Posipol Welcome

2 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME Thank you for your participation 1) Posipol Program 2) Some information 3) Goal of the Workshop

3 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME And many thanks to the sponsors…….

4 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME Program Wednesday : Registration 9.00 - 9.30 Morning Session 9.45 – 12.30 Afternoon Session 14.30 -17.30 Coffee Breaks 11.00 – 11.30; 16.00 – 16.30 Lunch 12.30 – 14.30 Thursday : Morning Session 9.30 – 13.15 Afternoon Session 14.30 – 16.30 Coffee Break 11.30 – 12.00 Lunch & Photos 13.15 – 14.30 Social event: Visit and Dinner at the Orsay Museum starting from 19.00 Friday : Morning Session 9.30 – 12.30 Afternoon Session 14.00 – 18.00 Coffee Breaks 11.00 – 11.30; 15.00 – 15.30 Lunch 12.30 -14.00

5 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME 1) Web Café – @ the “Science Museum” in front of the “salle bleue” 2) Wi-fi is active in the Auditorium 3) !!!! RER – Not all RER B trains from Paris stop in Orsay Ville. The good ones are directed to Saint Remy les Chevreuse and their code start either by P or by L (like for example PLAN, PAPY, LADY…….) On the platform take a look at the panel lights corresponding to the stops. 4) All the trains leaving from Orsay Ville go to Paris 5) Orsay Museum dinner: meeting at the museum at 19.00 6) There will be a group leaving from LAL 7) Lunch is foreseen at the BURES restaurant (have a look on the map…) 8) LAST MINUTE : TOMORROW => RESTAURANT STRIKE !!!!!! We are trying to have an emergency “spare solution”…(Sandwiches…..) We are really sorry. SPEAKERS (& Conveners): 10 min before your session check that your talk is loaded in the INDICO agenda. Information

6 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME For any problem: We have two kind assistants CATHERINEISABELLE

7 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME Workshop Goals POSIPOL 2006: discuss options and open issues of polarized positron source, based on laser Compton back scattering, for CLIC and ILC. assess and coordinate the outstanding R&D efforts towards a complete Compton source design. compare the issues with the undulator source. analyze the experimental programs carried out in the different laboratories. elaborate the baseline recommendation for CLIC.

8 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME Workshop Goals Main events since Posipol 2006: 1) CLIC parameters change 2) ILC RDR published. Meetings in Daresbury and Bejing 3) ILC next step = EDR 4) E166 results 5) GEANT4 polarized version 6) Compton sources: Fiber Laser Technology opens the way to high power, high repetition frequency lasers 7) Daresbury meeting - ERL scheme as possible Compton Driver 8) SuperB factory proposal (polarized positrons ?) 9) Rising interest the use of low energy Compton sources for Medical- Industrial applications

9 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME Workshop Goals Progress in Compton related studies and experiments: -Experimental results @ KEK and BNL (2 talks) -Fiber lasers (4 talks) -Re-circulation laser (1 talk) -2 Mirror cavity (2 talks) -4 Mirror cavity (1 talk) -Capture session ~ 2% @ ~42% polarization (3 talks), GEANT4 & EGS (1 talk) -Beam @ DR 1  mm mrad rms (1 talk) -Digital feedback for FP cavities (1 talk) -HERA fast polarimetry (1 talk) -Tech application: Lyncean Technology, other projects are starting (2 talks)

10 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME 1) Take stock of the situation of the different machines, schemes, studies and R&D’s. 2) Gather information on the new technologies (fiber laser, mirrors…). Define the possible associated R&D’s. 3) Find the overlap with the undulator solution, both for funding (EU FP7…) and common work. 4) Benchmark of the GEANT4 polarized version. 5) Review the industrial – medical applications of Compton machine (extremely important for R&D fund request). CLIC - Redefine the parameters. Analyze the differences from the earlier proposal and have a first “feasibility” scheme. ILC -Converge towards a scheme that can produce a valid “alternative” design and clearly assess what R&D’s are necessary to validate the scheme. -Point the way to EDR -Study the possibility of a demonstrator experiment -Define the aspects of the schemes that still need answering (stacking, costing…) and make a work plan SuperB -Introduce the new machine and address the case of polarized positrons. Introduce the FP7 design study Workshop Goals

11 Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME ENJOY the workshop and……. PARIS Workshop Goals


Download ppt "Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME WELCOME POSIPOL 2007 Goals Alessandro Variola MAY 23 rd 2007 Posipol Welcome."

Similar presentations


Ads by Google