Presentation is loading. Please wait.

Presentation is loading. Please wait.

Pacific FIA Data Collection Team - Portland. Team functions Collect P2 (FIA) Annual Inventory data 1 plot per 6,000 ac. Visit 10% (1 panel) per year (10.

Similar presentations


Presentation on theme: "Pacific FIA Data Collection Team - Portland. Team functions Collect P2 (FIA) Annual Inventory data 1 plot per 6,000 ac. Visit 10% (1 panel) per year (10."— Presentation transcript:

1 Pacific FIA Data Collection Team - Portland

2 Team functions Collect P2 (FIA) Annual Inventory data 1 plot per 6,000 ac. Visit 10% (1 panel) per year (10 year cycle) Field visit all forested and potentially forested locations National and regional data items WA, OR, CA, HI and Pac Islands All land ownerships

3 Team functions Collect P3 (FHM) data 1/16 of P2 plots 1 plot per 96,000 ac. Visit 20% per year (5 year cycle) National, regional data items + P3 indicators Soil, crown, DWM, P3 Veg (WA) Lichens, damage – no Ozone (off-plot)

4 Field measurements National CORE (P2 and P3) National CORE optional Regional core Regional additions Negotiated extras

5 Plot layout

6 Team functions Quality control/quality assurance Development of Regional field procedures guide Training “Check plots” of various types Field data recorder and edits Editing of data Analysis, accountability and reporting

7 Team functions Collect P2 (FIA) Annual Inventory data Collect P3 (FHM) data Quality control/quality assurance Expertise and technical assistance to analysts and users Plot setup, review and ownership “Special” studies (fire effects, riparian, SNEP, SOD, etc..)

8 Personnel 3 office staff 77 field-going staff

9 Personnel 4PFT Field coordinators 24PSE Crew leaders 4PSE QA/QC 14TSE Crew members 12Summer seasonal 16Students 3SCEP 77

10 Personnel CA CoordinatorPaul Guarnaccia OR/WA Coordinator Marc LaPine Pacific Island Coordinator Sarah Butler QA/QC Coordinator Phyllis Adams Data ManagerPerry Colclasure Admin AssistantPam Calegari

11 Budget $ 4.5 million Salary51% Travel16% Contracting13% Overtime10% Vehicles 4% Other 6% 100%

12 Schedule Annual inventory OR2000 (non-NFS) 2001 (all ownerships) CA2001 WA2002 P3 in all 3 states since 1998

13 Schedule Pacific Islands periodic inventories American Samoa2001 Guam2002 Palau2003 N. Mariana Islands2004 Federated States of Micronesia2005/6 Marshall Islands2007 ? Hawaii2008 ?

14 Schedule Alaska Coastal and SE2004 (non wilderness) 2005 (all lands, incl wilderness non-forested) Interior???

15 AK Boat

16 2004 Field plot summary WAORCATotal Phase 22753307011,306 Phase 3 Only313549115 Phase 3 Co-visited223848108 Contracted14325364460 2003 Carryover25113571 Total to field4966678972,060

17 Washington – all 10 panels

18 Washington – 1 panel

19 Washington – field visits

20 Washington – FIA crews

21 Washington – contract 1

22 Washington – contract 2

23 Contracting On publicly owned lands where R5 and R6 are contracting out other inventory work R5 and R6 have administered contracts Different challenges and advantages of each ~ 23% plots Cost effective way of doing business Doing both has provided flexibility

24 THE END

25 Questions


Download ppt "Pacific FIA Data Collection Team - Portland. Team functions Collect P2 (FIA) Annual Inventory data 1 plot per 6,000 ac. Visit 10% (1 panel) per year (10."

Similar presentations


Ads by Google