1 Bond Projects Update Madison Elementary SD December 2015

2 Tonight's topics  Simis progress update, move into new building and phase two schedule.  Park café replacement timeline.  Meadows two-story replacement timeline.  Other projects scheduled for winter recess.

3 Simis replacement

4

5

6

7

8

9 The move  Staff have been delivered boxes and instructions (10/15/15)  Completion of packing (12/18/15)  Items moved to new location (12/19-23/15)  Staff unpacking and preparing for students return (12/28-29/15)

10 Out with the old  Furniture  Technology

11 Simis Replacement

12 Timeline for major Bond Projects  Madison Park Café replacement, Project start (3/15/16) Completion (8/1/16)  Madison Meadows two-story classroom replacement, project start (9/1/16) Completion (7/1/17)

13 Other projects during winter recess  HVAC replacement, Rose Lane Elementary  HVAC replacement, Heights Elementary  Concrete floor re-polish MTA  Warranty on wrought iron fencing, MTA