 Under the US-Brazil Implementing Arrangement field data collection will end for NASA-funded investigators on December 17, 2004.  LBA-ECO Project Office.

Similar presentations


Presentation on theme: " Under the US-Brazil Implementing Arrangement field data collection will end for NASA-funded investigators on December 17, 2004.  LBA-ECO Project Office."— Presentation transcript:

1

2  Under the US-Brazil Implementing Arrangement field data collection will end for NASA-funded investigators on December 17, 2004.  LBA-ECO Project Office support in 2005  Transition/takedown activities  Support for continued data collection with CNPq licenses LBA-ECO Exit Plan

3  From December 17, 2004, until property transfer to Brazil is complete, only teams with a CNPq license and a NASA-funded investigator will be able to use NASA property, infrastructure, and resources for field data collection (unless the Implementing Arrangement is renewed). However, all Phase 2 LBA-ECO teams can continue to use NASA provided resources for takedown/transition/shipping activities in early 2005.  Dismantling of scientific sites and offices supported by LBA-ECO that are not otherwise in use by teams with CNPq licenses will continue through 2005.  Visas  NASA’s property department will allow us to transfer property to Brazilian institutions, either Permanently or on a long-term loan basis. Assumptions

4 Field Work in 2005 with CNPq licenses  Investigators collecting field data in Brazil after December 17, 2004 must arrange their own licenses, permitting, funding, and specify what logistical support they require from the Project Office. (Questionnaire)  Property issues and data collection continuity  By mid to late 2005, facilities will either need to be transferred to Brazilian operation, or be decommissioned.

5 Towers supported / operated by LBA-ECO  Investigators with CNPq licenses must identify any tower or other site where data collection will continue after 12/17/04.  Towers and sites in Santarém that are identified for use under approved CNPq licenses will continue to be maintained and supported by the following:  data techs  vehicles  generator maintenance and fueling  site and tower safety  Timeline

6 20042005 Santarém Towers Santarém Office LBA-ECO Shutdown Operations Aug. Data collection on Flux & Meteorological Towers & Meteorological Towers Backup power generator system Dirty / Wet Lab Dirty / Wet Lab Office Facilities Office Facilities Generator support Office Restoration Transfer of NASA Towers/Generators & Field Sites Transfer of NASA Office Furniture Transfer of NASA Lab Equipment Transfer of NASAComputers Transferred Dirty & Wet Lab Decommissioning Sept. Oct. Nov.Dec.Jan.Feb.Mar.Apr.MayJun.Jul.Aug.Sept.Oct.Nov.Dec.Jan. 2006 Transfer of NASA Field Gear GC Lab Decommissioned Office Shutdown Office Shutdown Annex Restoration Shutdown Annex Operations Santarém Annex Operations Data collection on Flux & Meteorological Towers associated with CNPq licenses Shutdown Ends for data collection Generator support associated with CNPq licenses

7 2005 LBA-ECO Shutdown Operations Science Team Equipment Vehicle Maintenance Base camp closes to investigator use Base Camp Vehicles Shipping Transfer NASA vehicles and boats 2004 LBA-ECO support for other offices Vehicles available for takedown/shipping activities Vehicles not transferred will go into storage in Belém/Acre/Mato Grosso/Brasília/Rondonia/Manaus Logistic aides at Brasilia and Rondonia LBA Offices Monetary support for Manaus camps and IBGE-Brasilia Aug.Sept.Oct.Nov.Dec.Jan.Feb.Mar.Apr.MayJun.Jul.Aug.Sept.Oct.Nov.Dec.Jan. 2006 LBA-ECO support to Central Office personnel Base camp property transfer


Download ppt " Under the US-Brazil Implementing Arrangement field data collection will end for NASA-funded investigators on December 17, 2004.  LBA-ECO Project Office."