Presentation is loading. Please wait.

Presentation is loading. Please wait.

Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.

Similar presentations


Presentation on theme: "Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc."— Presentation transcript:

1 Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.

2 Start - to - Finish Services Pre-construction Phase Work-In-Progress Phase Post-construction Phase

3 Conformance & Documentation Services List

4 Services Conformance Daily On-Site Conformance Inspection Daily Web-Based Job Log Reporting Searchable Web-Based Project Database

5 Services Documentation Pre-construction Photo & Video Documentation In-Progress Photo & Video Documentation Post-construction Photo & Video Documentation

6 Services Quick-Response Service* 24 – 7 Documentation & Inspection Services 24 Hour Media Production Turn-Around 24 – 7 Disaster & Emergency Services (*additional charges apply)

7 the Benefits of Media Documentation Conformance Inspection & Quick-Response services …

8 Client Peace-of-Mind Daily Conformance Inspection & Reports: Keep you in-the-know! Media Documentation: Photo & video records help protect you against insurance claims and serve as a permanent and powerful litigation resource. Quick-Response Service: Ready to be on-site to meet your disaster & emergency documentation needs. Benefits

9 Quality Control Assurance Demonstrates & helps ensure ongoing conformance practices. Identifies potential problems for correction as they unfold. Assists in post-construction site and adjacent site restoration requirements. Benefits

10 Time & Money Savings Reduces costly and time-consuming tear-outs. Reduces destructive and time-consuming testing. Reduces schedule disruptions and budget over- runs by enhanced communications between client / architect / engineer / contractor / sub- contractors. Reduces the need for client site visits. Benefits

11 Environmental & Safety Advantages Demonstrates environmental compliance. Reduces destructive and time-consuming environmental compliance testing. Helps assure safety compliance & reduce related claims. Dramatically reduces the need of paper records. Benefits

12 Long-Term Value Advantages Can increase resale, refinance and funding value by demonstrating quality of construction. Aids with future appraisals and insurance claims. Presents a “multimedia as-built” for use during ongoing maintenance and future alterations. Benefits

13 Communication Advantages Cutting edge communication resources for presentations to:  Project Meetings  Investors  Public & Regulatory Officials  Client Company Officers, Board Officials & Staff  Legal Venues  Community Organizations Benefits

14 Quick-Response* Advantages On-site at your call: 24 Hours a Day – 7 Days a Week  Natural disaster impact documentation.  Helps expedite procurement of disaster relief funds.  Prompt documentation for assistance in insurance claims.  Prompt documentation of property damage due to vandalism or other criminal activity.  Emergency documentation of project non-conformance & oversight concerns.  Prompt production of support documents & media. Benefits (*additional charges apply for this service)

15 How It Works

16 Part 1: Pre-Construction Phase 1.Details of project specifications, client requirements and parties involved are collected from the pre-construction meeting. 2.A visual inspection of existing property is conducted to identify key points of conformance & documentation interest. 3.The daily log reporting software is customized to the project requirements. 4.Pre-construction photo and video documentation is conducted. Copies are presented to client. How It Works

17 Part 2: Work-In-Progress Phase Daily conformance inspection begins at project start. Daily logs and reporting begins. Delivered daily via email to authorized persons. Logs include all pertinent job-log information, RFI’s, Submittals, etc. and any necessary in- progress photo documentation. Mid-project video and photo documentation is produced. Copies are delivered to client. Inspectors attend all job meetings & are on-call to assist with communications between client, architect, engineer and contractor(s). How It Works Job Log

18 Part 3: Post-Construction Phase Prior to conclusion of project any items for final documentation are identified. The final post-construction photographic and video documentation is produced. Copies are delivered to client. Upon project sign-off the completed database with all daily job logs and related media is compiled. A copy is delivered to client and a copy is archived at Sleighter Engineering main offices. How It Works

19 Quick-Response Service Client phones with full details of concerns, project section, location, item(s) to be reviewed & documented etc. Quick- Response request date and time is logged by Sleighter Engineering. Quick-Response Conformance & Documentation personnel are dispatched to site and execute necessary conformance and / or documentation services.. Quick-Response Conformance & Documentation personnel produce reports and related media and deliver to client within 24 hours. (via Internet, US Mail, Federal Express, UPS or hand delivery) Service receipt is confirmed and reviewed with client, and client is billed for services. How It Works

20 Contacts Sleighter Engineering, Inc. Phone: 724.438.4010 Fax: 724.438.4017 Email: info@sleighterengineering.com Web Site: www.sleighterengineering.com Offices: 1331 Connellsville Road Lemont Furnace, PA 15456 Robert W. Sleighter, P.E., Owner / President robsleighter@sleighterengineering.com “Engineering the Future”

21 Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc. Thank you for considering


Download ppt "Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc."

Similar presentations


Ads by Google