Presentation is loading. Please wait.

Presentation is loading. Please wait.

Visit on Friday 15 th March 2013. Still a building site – due to open in August.

Similar presentations


Presentation on theme: "Visit on Friday 15 th March 2013. Still a building site – due to open in August."— Presentation transcript:

1 Visit on Friday 15 th March 2013

2 Still a building site – due to open in August

3 A standard classroom

4 Martine Scott taking pictures for the records

5 A science lab – the chairs in the middle can be rearranged

6 Stairs that are wide with windows and outside light!

7 Home Economics – plenty of space

8 Toilets – the cubicle walls are still to be built! There will need to be discussion about the best design.

9 Looking into the canteen area – the steps on the right will also be an informal seating area

10 A high quality wooden finish in many areas with plenty of daylight throughout the building

11 High quality games hall. Very effective soundproofing panels and systems are used all over the school

12 Quality Welsh slate finish to the outside walls


Download ppt "Visit on Friday 15 th March 2013. Still a building site – due to open in August."

Similar presentations


Ads by Google