Presentation is loading. Please wait.

Presentation is loading. Please wait.

Progress Monitoring Schedules Step by Step. LOGIN: Customer ID = 3894 Username= First initial of first name And Last name Ex. mlemire.

Similar presentations


Presentation on theme: "Progress Monitoring Schedules Step by Step. LOGIN: Customer ID = 3894 Username= First initial of first name And Last name Ex. mlemire."— Presentation transcript:

1 Progress Monitoring Schedules Step by Step

2 LOGIN: Customer ID = 3894 Username= First initial of first name And Last name Ex. mlemire

3 1. Click the Progress Monitor Tab located on the top of the page 2. Click the Schedules Tab on the left of the page

4 Progress Monitoring: Adding a New Student 3. Click Manage Students Button

5 4. Type in student’s First and Last Name (only) 5. Click Search (DO NOT CLICK ADD) 6. Student name will be listed under “Student List” If no results- Type Last Name Only into search field If still no results contact external coach so the student can be searched/added to the system

6 7. Check box next to student name 8. Click Add PM button 9. A message will pop on the screen asking if you want to use the “schedule wizard” CLICK OK

7 A List of Measures will appear on the screen 9. Mark the RCBM (or other GOM) box 10. Click Next

8 A Schedule Page will appear The Goal start date is entered as the day the schedule is being made. Choose an end date 11. Choose Weekly or every two weeks 25<10%ile=weekly >10%ile= biweekly 12. Choose day of week 13. Click save

9 Once the schedule is created a Goal needs to be set 14. Click the word “Enter” under the column labeled “Goal”

10 15. Enter benchmark score under “initial corrects” 16. Enter Goal for end of school year. Goal is to be set to the Spring 25%ile cut score. **If you are progress monitoring at the 8 th grade level set the goal as 150WRC If conducted enter SLA scores

11 How to Add a Program Change/Intervention Line

12 Sign Into AIMSweb Click on the blue “Progress Monitoring” Tab

13 Click on the date under the Next Score column for the desired student

14 Click the link labeled “Show All Weeks of This Schedule.”

15 On the date you are changing the intervention, click the “I” icon

16 Enter the Intervention details as needed. Click “Add”

17 Click “Save”

18 To view Progress Monitoring Graph with new intervention line click “insufficient scores” in the Progress Report column

19 Your graph will now display an intervention line


Download ppt "Progress Monitoring Schedules Step by Step. LOGIN: Customer ID = 3894 Username= First initial of first name And Last name Ex. mlemire."

Similar presentations


Ads by Google