ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.

Similar presentations


Presentation on theme: "ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx."— Presentation transcript:

1 ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx

2 Contents General Documents 2015-TS2 documentation 2015-TS3 documentation 2015-2016 YETS documentation 2015-08-26S. Chemli for EN-MEF-DC2

3 Contents General Documents 2015-TS2 documentation 2015-TS3 documentation 2015-2016 YETS documentation 2015-08-26S. Chemli for EN-MEF-DC3

4 ATS-PM-MS-0001 Version 1.1 → 2015-10-13 Length of YETS 2015-2016 / EYETS 2016-2017 J. Coupard, D. Hay, D. McFarlane, S. Mataguez This is a proposal for the Year-End Technical Stops and the Extended Year-End Technical Stops before the Long Shutdown 2. It defines the length of the Technical Stops in the PS, PSB, SPS and LHC accelerators. Start and end dates of the YETS and EYETS might evolve in time, but lengths need to remain unchanged. 2015-08-26S. Chemli for EN-MEF-DC4 Master Schedule Under Approval

5 Contents General Documents 2015-TS2 documentation 2015-TS3 documentation 2015-2016 YETS documentation 2015-08-26S. Chemli for EN-MEF-DC5

6 LHC-X5ZDC-EC-0002Installing Optical Fibres & High Voltage Cables for the CMS ZDC Upgrade LHC-BCCM-EC-0001Inclusion of Beam Current Change Monitor as part of LHC Machine Protection Backbone 2015-TS2 Configuration 2015-08-26S. Chemli for EN-MEF-DC6

7 Contents General Documents 2015-TS2 documentation 2015-TS3 documentation 2015-2016 YETS documentation 2015-08-26S. Chemli for EN-MEF-DC7

8 LHC-BGV-EC-0004Installation of a Protection Device for the BGV Detectors in LSS4 of the LHC LHC-X8FC-EC-0002Temporary Installation of LHCb Scintillating Fibre Tracker Test-Beam Module in RB84 LHC-VY-EC-0001Installation of New Racks for the Vacuum Pilot Sector in LSS L8 of the LHC 2015-TS3 Configuration 2015-08-26S. Chemli for EN-MEF-DC8

9 Contents General Documents 2015-TS2 documentation 2015-TS3 documentation 2015-2016 YETS documentation 2015-08-26S. Chemli for EN-MEF-DC9

10 LHC-LJ-EC-0044Change of Powering for Q4 in IR1 LHC-TC-EC-0004Modification of Vacuum Layout to Recover TCT Fifth Axis Translation at IP1/5 LHC-XRP-EC-0012CT-PPS Timing & tracking detectors in horizontal Roman Pots (for standard optics) LHC-XRP-EC-xxxxTOTEM Timing detectors in vertical Roman Pots (for high beta*) LHC-XAFP-EC-0002Installation of the ATLAS/AFP stations, Phase-1 LHC-XAFP-EN-0001Alleviating the Helium Release Hazard in short Interventions to the AFP Roman Pot Stations during LHC Operation ` 2015-2016 YETS Configuration 2015-08-26S. Chemli for EN-MEF-DC10 Could start with TS3, then YETS

11 LHC-LJ-EC-0044Change of Powering for Q4 in IR1 LHC-TC-EC-0004Modification of Vacuum Layout to Recover TCT Fifth Axis Translation at IP1/5 LHC-XRP-EC-0012CT-PPS Timing & tracking detectors in horizontal Roman Pots (for standard optics) LHC-XRP-EC-xxxxTOTEM Timing detectors in vertical Roman Pots (for high beta*) LHC-XAFP-EC-0002Installation of the ATLAS/AFP stations, Phase-1 LHC-XAFP-EN-0001Alleviating the Helium Release Hazard in short Interventions to the AFP Roman Pot Stations during LHC Operation ` 2015-2016 YETS Configuration 2015-08-26S. Chemli for EN-MEF-DC11 Could start with TS3, then YETS

12 LHC-TDI-EC-0002Foreseen for September LHC-TDI-ES-0002Foreseen for September LHC-HHAAS-EC-0001Flood Sensors for LHC Lifts LHC-HHAAS-ES-0003Mitigation Measures during the PX24 Lift Replacement LHC-RP-EC-0001Change of RPTG Power Converters: LHC Warm Magnets Circuits RD1 and RD34 LHC-VAZ-EC-0005New Pumping Configuration for the Inner Triplet Left of Point 2 in the LHC 2015-2016 YETS Configuration 2015-08-26S. Chemli for EN-MEF-DC12

13 CT-PPS CMS-TOTEM Precision Proton Spectrometer Cerenkov Quartic timing detectors (cylindrical Roman Pots, 220m region, sector 4-5 and 5-6) & associated components – start: YETS 2015/2016 -> TS 2016 – ECR under preparation Pixel detector (horizontal RPs, 210m near/far, sector 4-5 and 5-6) & associated components – start: YETS 2015/2016 -> TS 2016 – ECR under preparation Clock distribution system - based on rigid RF cable to be laid from 220m region sector 4-5 via the bypass to 220m region of sector 5-6. – start: YETS 2015/2016 – ECR draft version already in EDMS (Finn Rebassoo) – First meeting with G. Canale (EN-MEF) took place last week 16.9.2015 -> problems with the size of the cable drum -> not yet clear how to proceed. Already referenced as LHC-XRP-EC-0012 From M. Lamont presentation LS2 days - 2015-09-29 indico 436324

14 TOTEM Plan to progressively install the detector components in the Roman Pots Diamond Timing Detectors (vertical RPs of 220m near, sector 4-5 and 5-6) & associated components – start: TS3 2015 -> YETS 2015-2016 – ECR - under preparation Pico-second clock distribution system (fibre based) – start: TS3 2015 -> YETS 2015-2016 – ECR - under preparation From M. Lamont presentation LS2 days - 2015-09-29 indico 436324

15


Download ppt "ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx."