Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Plan Review Boiler Xpress Oneeb Bhutta Ryan Beech Matt Basiletti Mike VanMeter.

Similar presentations


Presentation on theme: "Project Plan Review Boiler Xpress Oneeb Bhutta Ryan Beech Matt Basiletti Mike VanMeter."— Presentation transcript:

1 Project Plan Review Boiler Xpress Oneeb Bhutta Ryan Beech Matt Basiletti Mike VanMeter

2 Major Milestones Propulsion PDR #1 Aerodynamics PDR #1 Structures and weight PDR Dynamic modeling PDR Propulsion PDR #2 Aerodynamics PDR #2 Flight performance, S&C PDR Parts list

3 Timeline 9/2510/310/1710/1010/2410/31 Aerodynamics Propulsion Dynamics, S&C Structures Aero PDR #1Aero PDR #2 Dynamic Modeling PDRS&C PDR Propulsion PDR #1Propulsion PDR #2 Structures PDR Aero PDR #1 A/C Drag Polar Sample wing const. Aero wing test Aircraft mathematical model Airspeed calibration Initial sys. sizing Test stand const. Sys. testing Final sys. sizing CDR Structures PDR Prelim. CAD drawing Final CAD drawing

4 Structures Preliminary CAD drawing Load analysis Structural wing testing Weight estimate Verify and refine Components Materials Identify material properties 9/2510/310/1710/1010/2410/31 Structures PDR Prelim. CAD drawing Final CAD drawing

5 Aerodynamics Complete drag polar prediction Airfoil selection Aerodynamic wing test Verify aerodynamic model C L, C Lmax, C D Wing load distribution 9/2510/310/1710/1010/2410/31 Aero PDR #1Aero PDR #2 Aero PDR #1 A/C Drag Polar Sample wing const. Aero wing test

6 Dynamics and Control Block diagrams Transfer functions Roll rate feedback control Prediction of dynamic response Root locus Nominal feedback gain Stability derivatives and control surface analysis 9/2510/310/1710/1010/2410/31 Dynamic Modeling PDRS&C PDR Aircraft mathematical model Airspeed calibration

7 Propulsion Build propulsion system stand for use in Boeing wind tunnel Power analysis to size motor Motor testing test matrix Varying gear ratio Varying propeller Varying voltage 9/2510/310/1710/1010/2410/31 Propulsion PDR #1Propulsion PDR #2 Initial sys. sizing Test stand const. Sys. testing Final sys. sizing

8 Timeline 9/2510/310/1710/1010/2410/31 Aerodynamics Propulsion Dynamics, S&C Structures Aero PDR #1Aero PDR #2 Dynamic Modeling PDRS&C PDR Propulsion PDR #1Propulsion PDR #2 Structures PDR Aero PDR #1 A/C Drag Polar Sample wing const. Aero wing test Aircraft mathematical model Airspeed calibration Initial sys. sizing Test stand const. Sys. testing Final sys. sizing CDR Structures PDR Prelim. CAD drawing Final CAD drawing


Download ppt "Project Plan Review Boiler Xpress Oneeb Bhutta Ryan Beech Matt Basiletti Mike VanMeter."

Similar presentations


Ads by Google