Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.

Similar presentations


Presentation on theme: "Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC."— Presentation transcript:

1 Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC

2 Coil PHA01 F,FPHA02 F,FPHB01 FPHB02 F,F, FLE IL Endshoe LE IL Endshoe F,F,F,L LE OL Endshoe F,F,S, F SSF,L,L,L F,F RE IL Endshoe RE IL Endshoe F RE OL Endshoe LL,FL,S,S,F, S IslandS,S F: Failure (current jumps > 1 mkA) L: Current rises continuously, to > 1mkA S: Short (few  – tens of k  ) HQ, LQ HQ/LQ HiPot Failures before the test

3 Coil PHA01 F, FPHA02 FPHB01 SPHB02 SLE IL Endshoe LE IL Endshoe LE OL Endshoe RE IL Endshoe RE IL Endshoe RE OL Endshoe IslandS, S OL RE Spacer S F: Failure (damage) S: Short HQ, LQ HQ/LQ coil failures during/after the test

4 Coil Parts Task Force Video MtgG. Ambrosio 44 Issues and Remedies - I  Endshoes to coil/endshoe/heaters  BNL (LQ) OL instrumentation procedure  Replace saddles and extensions after HT with insulated parts What insulation (adhesive Kapton, coating, …)? What to do with available parts (remove some mills from selected surfaces, …)? Short term: add 2 mil Nomex, and reduce S2_layer on OD (coil #15) Mid term: remove 10mil from OD, and add coating on OD and cable surface (#17) Long term: new parts with less material on all surfaces, rounded edges, and coating on all surfaces Action Items: -Set specifications for coating -Explore coating at 3 labs -Decide coating material and thickness

5 Coil Parts Task Force Video MtgG. Ambrosio 55 Issues and Remedies - II  Heaters to coil  Reinforce insulation under heaters How much? –Quick check of QP How much can fit the present HQ design?  Change heater design in order to avoid critical areas Short term: add 2 mil Kapton, and reduce S2_layer on OD (coil #15) Mid term: … + new heater design (#16) Long term: after test results assess if 2 layers of Kapton are OK (if not: 3mil E-glass/ other materials) Action Items: -Design and procure new heaters

6 Coil Parts Task Force Video MtgG. Ambrosio 66 Issues and Remedies - III  Island and spacers to coil  Reinforce insulation around ramp How to do it (part modification, …)?  Coating/anodization/… Start from island because of 2 times higher voltages, more likely to see quenches  Winding around end parts Meeting with techs Short term: - NA - Mid term: remove ?? from parts (?), and/or add coating Long term: new parts with less material on all surfaces, rounded edges, and coating on all surfaces - Including wedges?

7 Coil Parts Task Force Video MtgG. Ambrosio 77 Coating Specs  Two options re HT:  Heat treatment resistant (up to 700 C in Argon)  No HT resistant (back up)  Cooldown resistance  Down to 2 K  Voltage breakdown  > 1 kV  Compatible with potting  Epoxy, Cynate_Ester, Matrimid  Good bonding strength after several thermal cycles 2 – 300 K  ESH compliant

8 Coil Parts Task Force Video MtgG. Ambrosio 88

9 Coil Parts Task Force Video MtgG. Ambrosio 99 Other suggestions  By Maxim:  Trace layer thickness: study how it affects heat transfer vs electrical integrity  Shoe-to shoe: thicker insulation is needed  Voltage tap traces may be shorting to LE OL Endshoe  Heater may be punched by Endshoes edges  Add “Rounding of edges” to drawings and travelers  Other suggestions?

10 Coil Parts Task Force Video MtgG. Ambrosio 10

11 S. Caspi, LBNL Coils Assembly and Alignment 11 Alignment Keys Collars Coil & heater LARP DOE review, FNAL June 1-2, 2011


Download ppt "Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC."