Presentation is loading. Please wait.

Presentation is loading. Please wait.

Christophe Lesniak Industrial Technologies DG Research European Commission 3 March, 2010 Energy-efficient Buildings PPP: Statistics of evaluation results*

Similar presentations


Presentation on theme: "Christophe Lesniak Industrial Technologies DG Research European Commission 3 March, 2010 Energy-efficient Buildings PPP: Statistics of evaluation results*"— Presentation transcript:

1 Christophe Lesniak Industrial Technologies DG Research European Commission 3 March, 2010 Energy-efficient Buildings PPP: Statistics of evaluation results* * based on input by applicants 9th Operational Group (OG9) meeting March 3, 2010 CSTC/WTCB/BBRI (Zaventem, Brussels)

2 Call Topics WP 2010 Energy-efficient Buildings PPP Coordinated Call Deadline for all topics: 3 November 2009  EeB.NMP.2010-1 New nanotechnology-based high performance insulation systems for energy efficiency – NMP  EeB.NMP.2010-2 New technologies for energy efficiency at district level - NMP  EeB-ICT-2010.10.2 ICT for energy-efficient buildings and spaces of public use – Collab Projects & CSA – ICT  EeB.ENV.2010.3.2.4-1 Compatible solutions for improving the energy efficiency of historic buildings in urban areas - ENV  EeB-ENERGY.2010.8.1-2 Energy efficiency in buildings (demonstration) - ENERGY

3 Statistics per EeB topic Call topic Available Budget Number of proposals received Total Requested funding Average requested funding per project EeB.ENV.2010.3.2.4-1 5520.9 M€4.2 M€ EeB.NMP.2010-1 301136.8 M€3.3 M€ EeB.NMP.2010-2 850.8 M€6.4 M€ EeB-ENERGY.2010.8.1-2 151033.8 M€3.4 M€ EeB-ICT-2010.10.2 152664.3 M€2.5 M€ 60206.7 M€3.4 M€

4 Results of EeB evaluation Call topicNORLRNTotal Success rate EeB.ENV.2010.3.2.4-1 221520% EeB.NMP.2010-1 4251145% EeB.NMP.2010-2 512825% EeB-ENERGY.2010.8.1-2 7031030% EeB-ICT-2010.10.2 19162623% Total all topics evaluated 376176028% RN=Retained, RL = Reserve List, NO = not passing thresholds

5 Share by Country in RN projects (as requested) Group Cou ntryICTNMPENVEnergyTotalGroupCountryICTNMPENVEnergyTotal EU-15AT3.7%0.0%11.2%0.0%1.6%EU-12CZ0.0% 2.1%0.0%0.2% BE5.6%7.9%4.3%0.0%5.5% HU0.0% 2.3%0.0%0.2% DE11.9%21.9%27.7%15.4%18.8% LT0.0%0.1%0.0% 0.1% DK0.0%1.7%5.6%6.4%2.6% PL4.8%4.7%0.0%0.8%3.6% EL3.0%3.5%0.0% 2.4% RO0.0%0.6%0.0% 0.3% ES12.8%15.1%6.6%7.7%12.5% SK4.3%0.0% 0.9% FI6.1%3.3%0.0%3.7% EU-12 Total 9.1%5.5%4.5%0.8%5.2% FR3.5%2.0%3.2%7.8%3.6% IE0.0%1.1%0.0% 0.5%Ass countryCH0.0%3.0%0.0%10.8%3.7% IT22.0%9.5%29.4%4.6%12.7% IL0.0%1.3%0.0% 0.7% NL2.4%8.3%3.8%11.7%7.4% NO3.4%0.0% 7.1%2.2% PT5.5%1.4%0.0%1.2%2.2% TR0.0%1.1%0.0% 0.6% SE6.3%6.1%0.0%22.9%9.1%Ass country Total 3.4%5.4%0.0%17.8%7.1% UK4.6%7.2%3.8%0.0%5.0% EU-15 Total87.5%89.1%95.5%81.4%87.7%Grand Total100%

6 Share by Type of organisation in RN projects (as requested) HE = Higher Education, PFP = Private for Profit, PUB = Public organisations, RES = Research organisations Environment Submitted Retained NMP Submitted Retained Energy Submitted Retained ICT Submitted Retained Total Submitted Retained HE44%37%HE16%12%HE14% HE25%30%HE21%18% OTH4%14%OTH4%0%OTH21%10%OTH1%0%OTH6%3% PFP31%28%PFP45%53%PFP35%42%PFP51%50%PFP44%48% PUB4%3%PUB5%1%PUB19%18%PUB2%0%PUB6%4% RES17%19%RES30%34%RES12%16%RES21%20%RES23%26% Total100% Total100% Total100% Total100% Total100%

7 Share of funding for SMEs in RN proposals (as requested) ThemeSubmittedRetained NMP29%27% Environment22%32% Energy29%16% ICT34%20% Total30%24%

8 Provisionnal Budget for WP 2011(*) CALL TOPICBUDGET (Mio€) EeB.ENV.2011-1 EeB.ENV.2011-2 5 0.5 EeB.NMP.2011-1 EeB.NMP.2011-2 EeB.NMP.2011-3 EeB.NMP.2011-4 40 EeB.ENERGY.201120 EeB.ICT.2011-1 EeB.ICT.2011-2 19 1 TOTAL85.5 (*) TBC

9 INFO-DAYS 9th July 2010 (Brussels) AM: Plenary session for the three PPPs PM : Brokerage event 1-2 nd June 2010 (Switzerland/Geneva ) Leaflets available

10  First-hand information on the next FP7/PPP calls  Pre-arranged Face-2-Face meetings for business, innovation and R&D partnering  Visits of Swiss cleantech companies & labs www.meet4cleantech.eu

11 Disclaimer: Thank you for your kind attention Disclaimer: Aspects of these presentations interpret legal documents. Only these legal documents are legally binding. 6 th Ad Hoc Industrial Advisory Group for the PPP EeB, Brussels, 22 February 2010


Download ppt "Christophe Lesniak Industrial Technologies DG Research European Commission 3 March, 2010 Energy-efficient Buildings PPP: Statistics of evaluation results*"

Similar presentations


Ads by Google