Presentation is loading. Please wait.

Presentation is loading. Please wait.

Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,

Similar presentations


Presentation on theme: "Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,"— Presentation transcript:

1 Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M, joachim.koss@gemalto.comjoachim.koss@gemalto.com Meeting Date: 2014-02-17 Agenda Item: 6 - Reports from Ad-Hoc Groups

2 Issues for DECISION in TP No issues for decision © 2014 oneM2M Partners TP-2014-0005R01 2

3 Issues for DISCUSSION in TP © 2014 oneM2M Partners TP-2014-0005R01 3 Issue 1 - Release Management – all deliverables included in the current oneM2M Work Programme are not allocated to specific Releases (are all TSs part of the first Release?) – WPM proposes the TP to give guidance about the process of allocation in particular considering the challenging time frame for the first Release and the amount of planned deliverables as well as their level of completeness – The co-ordination group may convene respective additional evening/morning session(s) during the TP9 meeting week and after to prepare a strategy for a TP decision

4 Items for INFORMATION Meetings held since last TP 13 Feb Meetings planned In March Frame conditions: Start of conference calls not earlier than 5:00 in the morning local time of any region End of conference calls not later than 0:00 midnight local time of any region Typical duration: 1 hour Typical in timely collocation with a conference call of another group (before that one) only applicable during summertime © 2014 oneM2M Partners TP-2014-0005R01 4

5 Items for INFORMATION Achievements / Progress – The oneM2M Work Programme ADM-0001-oneM2M_Work_Programme-V9_00_00 has been prepared for including the Rapporteur updates (schedule, level of completeness) during TP9 – The Work Programme textual part was progressed – A discussion on a potential WPM role in the Release description process has started © 2014 oneM2M Partners TP-2014-0005R01 5


Download ppt "Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,"

Similar presentations


Ads by Google