When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.

Similar presentations


Presentation on theme: "When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house."— Presentation transcript:

1 When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house

2 Facing brick being built

3 Quoin stones and DPC

4 DPC in position

5 DPC between wall and floor

6 Blocks ready for internal walls

7 Wall ties in position

8 Preparing scaffolding for the next level of bricklaying. Toe plates and bracing still need to be added

9 Getting the mortar mixed

10 Internal wall with wall tie

11 DPC in place for a window

12 Another view of DPC

13 Pointing the facing brick

14 Internal cavity wall with wall ties

15 Special heads on site

16 Standard concrete heads in position

17 A longer concrete head

18 Pride in the job

19 A concrete element over a fireplace

20 The beginnings of a chimney

21 Chimney breast to first floor level

22 Finished to first floor level

23 Window frame base built up

24 At finished level on special heads

25 Inside wall to window level

26 Bricklayers string level in position

27 Layer of mortar in place for bricks


Download ppt "When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house."