Westinghouse/Southern/SCANA – New Build Configuration Management

Similar presentations


Presentation on theme: "Westinghouse/Southern/SCANA – New Build Configuration Management"— Presentation transcript:

1 Westinghouse/Southern/SCANA – New Build Configuration Management
Eric Pace – V.C. Summer – CM Supervisor V.C. Summer 2&3 – Configuration Management Team Prentice Gilbert – Vogtle- CM Supervisor Vogtle 3&4 – Configuration Management Team BOTH Introduce ourselves and our roles within our Organizations Don’t spend a lot of time here.

2 Objectives Provide an update on construction progress for Summer 2&3 and Vogtle 3&4. Provide a summary of the Joint Pilot on Information Turnover. Provide summary of ongoing efforts with consortium on Configuration Management. Provide an update on Configuration Management system development at both sites. PRENTICE

3 ERIC - Use slide to show site layout

4 ERIC Use slide to talk about recent construction activities, issues, and progress

5 PRENTICE Slide showing Layout from Josh’s presentation last year. Feel free to replace with a better slide.

6 PRENTICE Use this slide to include a more recent photo of Vogtle construction to use in discussing project progress. You can opt to not include a more recent picture and just discuss from previous slide.

7 Information Turnover Joint Pilot
Scope of Information Turnover Pilot Results of Information Turnover Pilot Information transfer infrastructure Insight into information review and acceptance Insight into Consortium information inventories Contacts within Consortium for Information Turnover Additional actions to be taken BOTH Information Turnover Includes: | For All: Records | - Systems Engineering Documents | - Areas Native Files | - Components Master Equipment List | - Programs Program Data 3D Model ________________________________________________________ Joint Pilot Participants are SCE&G, Southern Company, Westinghouse, and CB&I. The Objectives of the pilot were to identify all consortium information sources, Identify infrastructure and processes required for turnover Record activities and milestones required to support the information turnover and to transfer selected systems, areas and programs from the consortium to each customer Perform an inventory of available consortium information (documents and data) Identify the required utility program information (documents and data) Determine the transfer processes required for turnover of the information from the consortium to the customer The Focus Areas, systems, areas and program evaluated, as part of the pilot scope are: Standard Plant System, Spent Fuel Pool Cooling System (SFS) Standard Plant System, Non Class IE DC and UPS System (EDS) Site Specific System, Yard Fire Water System (YFS)/Vogtle Only Area, Main Control Room (MCR) Program, MOV Program

8 Lessons Learned Turnover Pilot Simulator & 301 Turnover
Underestimated Quantity of Documents Handling of SUNSI information varied File Size Transfer Issues Shortfalls in Data Validation and Releasable Reviews Simulator & 301 Turnover Single point accountability (STS System & 301 Turnover Engineers) Thorough walk downs (identified 161 punch list items for STS, 92 for 301) Strong partnership with Construction Oversight Clearly define expectations early for scope of turnover Physical Boundaries Documentation Expectations Identifying/Transferring Manufacture Warranties PRENTICE

9 Ongoing CM Activities Information Handover Processes
Information Turnover Contract Details Master Equipment List Improvement Program Data Acquisition Station Equipment Labeling BOTH

10 CMIS Development SmartPlant® Foundation Provides
Change Control User Securities Relationship Synchronization Traceability Over All Engineering Documents, Assets, and Requirements ERIC

11 CMIS Development Various Organizational Data Needs… Single Source of Truth ERIC

12 CMIS Development SmartPlant® Foundation The CMIS System Will Improve:
CM Principles Process Efficiencies Modification Overhead Engineering Programs 3D Model Relationships Data Centralization Document-Tag Cross Referencing Critical Document Electronic Conversion, Centralization, Access Document Centric ERIC Time to Find and Verify Data

13 CMIS Development Phased Development Approach
Configuration Management Information System Procedure Development: July 2015 Station Master Equipment List: December 2015 Engineering Documents: April 2016 Information Turnover: July 2016 Engineering Change Process: July 2016 Engineering Program Data: Late 2016 Procurement and Warehouse: Late 2016/Early 2017 ERIC

14 CIMS Development PRENTICE

15 CIMS Configuration Information Management System
Equipment Database, MEL Relates drawings, rooms, components, FSAR, MEL etc. Interfaces with Maximo and Documentum Automate Design processes: DCP’s ABN’s Production Rollout: March 2015 PRENTICE

16 What is Enterprise Bridge (eB)?
eB is Asset Lifecycle Information Management Assets Plant & Equipment Requirements Documents People & Organizations Projects Lifecycle Design, Construction, Operation, & Maintenance Information Management Timely access to trusted information PRENTICE

17 Solution Architecture
PRENTICE

18 Object Classification
Documents Equipment Requirements Drawings Pumps Design Basis Procedures Valves Safety Rqmts Calculations Switches CFRs PRENTICE Correspondence Test Equipment Contracts Invoices Tooling Test Plans

19 Contextual Mapping PRENTICE Change Events People Organizations
Equipment Documents PRENTICE Distribution Order Projects Requirements

20 Change and Configuration Management in eB
Requirements What must be there What is there What we say is there PRENTICE Closed-loop Change Process Data and Documents Items

21 Design Change Process Looks for other affected objects
Gathers objects using eB relationships Refine by analyzing candidates PRENTICE

22 Work Flows Document Upload Edit Document Review Document
Reject Approve Document PRENTICE Post to Documentum Approve

23 Efforts to Date Handover Process Master Equipment List (MEL)
Process now well Established Docs Requested – 25,282; Docs Received – 20,473 Synchronizing with Site Data Center Master Equipment List (MEL) 50,000+ tags loaded to date WEC, CB&I, and SNC MEL Development Team (MDT) Subcomponent Review Board (SRB) PRENTICE

24 Questions ERIC