1 Florida Gas Transmission 16-Inch Section#2 Hydrostatic Test
16-Inch Saint Petersburg Lateral Pipeline From Lakeland to Plant City Polk and Hillsborough Counties

2 Today’s Outline Who is Florida Gas Transmission (FGT)?
Why is FGT testing? What is the test exactly? When will the test occur? Where will the test take place? How will the test be conducted? How will the test affect me?

3 Florida Gas Transmission Company
Natural gas transmission company operating a 5,000 mile pipeline system along the Gulf Provide majority of the natural gas for power generation in Polk / Hillsborough Counties 16-inch diameter pipeline serving Tampa area Customers include: Electric utility companies Local distributors Industrial clients

4 Need for the Test The U.S. Department of Transportation regulates all interstate pipelines Testing is federally mandated Best practice to confirm the safety and reliability of the pipeline Safety is our #1 priority Ensure continued superb client service

5 Nature of the Test Hydrostatic Test
Remove the natural gas from the line Controlled release vents harmlessly into atmosphere Service is maintained on another system Test the integrity of the pipeline by filling the line with water Put the water under pressure for a fixed period of time

6 Background Hydrotesting the 16-inch lateral system
Standard, common pipeline test procedure Recent, successful pipeline tests were completed in: Polk testing begins in October 2015 Hillsborough Palm Beach Miami-Dade St. Lucie Broward Martin

7 Prepare System for Testing
Project Process Begin Project Obtain Permits Prepare System for Testing Conduct Hydrotest End Project Public Awareness Campaign

8 Project Schedule Test window is set: Monday, 19 October 2015
TASK DATE Community Awareness July – November Permit Applications July – August System Preparation August – September Test Preparation September – October Conduct Hydrotest 19 October 2015 Test window is set: Monday, 19 October 2015 Early morning, midnight – 4:00 a.m.

9 Project Location Total Project Length = 5.6 miles
Begin: CR 35 / Kathleen Rd, Lakeland End: Buddy Rogers Wy, Plant City Generally runs across rural areas: From northeast to southwest Crosses CR 35 / Kathleen Rd Crosses CSX railroad tracks Within Unincorporated Polk County and Unincorporated Hillsborough County

10 Project Location (con’t)

11 How the Test is Performed
Remove natural gas from the pipeline Completed the week before the hydrotest Fill the line with water Pressurize the system Normal operating pressure is 788 PSI Test pressure is up to 1,350 PSI Relatively short duration (approx. 30 minutes) Reduce to intermediate pressure at 1,225 PSI Maintain for 8 hours

12 How the Test is Performed (con’t)
De-pressurize the line Drain the water from the system If any integrity issues are found: They are corrected as soon as possible The hydrotest is performed again Any re-testing will be performed as soon as possible, during the same hours Resume normal natural gas service

13 Safety During the Test Safety is our #1 priority
Performed extensive test preparations, including an inspection of the entire system Any pipe anomalies will be repaired in advance of conducting the hydrotest For the duration of the high pressure test, as a safety consideration, we plan to isolate sections of the pipeline route from people and traffic

14 Conducting the Test Advance Preparations
Make all key stakeholders aware Adjacent property owners Emergency service providers General driving public Announcements Flyers, newspaper, website, etc. Dynamic message signs 2 weeks in advance

15 Conducting the Test (Con’t)
Night of the Test Begin at midnight If needed, close roads with barricades (none anticipated at this time) Law enforcement support Confirm all-clear along the 5.6-mile corridor Conduct hydrotest Reopen any roadways by 4:00 AM

16 Traffic Control During the Test
Officers will be stationed at roads with pipe crossings Emergency responders will always be able to cross as needed Any detours will include signs and officer support

17 Location – Polk Co. D-5

18 Location – Hillsborough Co. D-4

19 For More Information Please visit our website: www.fgthydrotest.com
Or contact FGT: Mr. Terry Coleman 2405 Lucien Way, Suite 200 Maitland, FL 32751 Toll Free – 844-FGT-INFO ( ) Office – Fax –

20 FGT 16-Inch #2 Hydrotest Summary
Federal mandate Testing with water Test will be Monday, October 2015 Midnight – 4:00 AM With law enforcement at select locations Emergency vehicles can always cross

21 Thank You