Presentation is loading. Please wait.

Presentation is loading. Please wait.

The European Organisation for the Safety of Air Navigation EAD AIXM 5.1 Implementation Razvan Guleac DNM/COO/NOM/ADM AIXM 5.1 Seminar.

Similar presentations


Presentation on theme: "The European Organisation for the Safety of Air Navigation EAD AIXM 5.1 Implementation Razvan Guleac DNM/COO/NOM/ADM AIXM 5.1 Seminar."— Presentation transcript:

1 The European Organisation for the Safety of Air Navigation EAD AIXM 5.1 Implementation Razvan Guleac DNM/COO/NOM/ADM AIXM 5.1 Seminar

2 EAD AIXM 5.1 Implementation 2 PLANNING

3 EAD AIXM 5.1 Implementation 3 EAD Evolution One release every 12 Months Client involvement during definition & assessment Dedicated workshops depending on release content Extensions to a release Necessity to react to the needs of the EAD clients On dedicated topics No impact on existing MyEAD/ESI API Between release – every 6 months Patches Maximum one per month Bug fixing

4 EAD AIXM 5.1 Implementation 4 EAD Development Process Web Tool – EAD CHM Tool Extension End of October/ Beginning of November Release 12 months 6 m Evolution TF members SSG Members DOP, ITP Subsystems Etc. EUROCONTROL ICAO SES Etc. Test Acceptance End of April / Beginning of May Release Test Acceptance Operational Regulatory

5 EAD AIXM 5.1 Implementation 5 EAD Change Management Tool

6 EAD AIXM 5.1 Implementation 6 EAD CHM – 814 – Route Package Download in AIXM 5.1

7 EAD AIXM 5.1 Implementation 7 Future Implementation Milestones AIXM 5.1 Digital NOTAM ICAO 2012 Flight Plan

8 EAD AIXM 5.1 Implementation 8 AIXM 5.1 Implementation (1) MAR 2011 R6 R6E1R7 NOV 2011APR 2012 EAD Production EAD Pre-Ops AIXM 5.1 Analysis, Specifications, Development, Testing 6 months Obstacles Upload Digital NOTAM Increment 1 Min SDO Download AIXM 5.1 decoupling Min SDO Download Obstacles Upload / Download Digital NOTAM Increment 1 Min SDO Download

9 EAD AIXM 5.1 Implementation 9 AIXM 5.1 Implementation (post R7) NOV 2012 R7E1 R8R8E1 MAY 2013NOV 2013 ADQ Support: Upload – ADQ scope (AIP, Charting, eTOD) Digital NOTAM upload & visualisation …

10 EAD AIXM 5.1 Implementation 10 SDO 5.1 Architecture

11 EAD AIXM 5.1 Implementation 11 System Architecture AIP CHP INO-DP (current) Digital NOTAM AIP I/F CHP I/F INO-DP I/F Digital N. I/F AIXM 5.1 Download AIXM 5.1 -> CACD Mapping CFMU CACD AIXM 5.1 -> ARINC Mapping AIXM 5.1 -> AIXM 4.5 Mapping ARINC Data User AIXM 4.5 Data User AIXM 5.1 Data User AIMSL I/F ESI I/F HMI I/F AIMSL WS AIMSL WFS AIXM 5.1 DP - ESI AIXM 4.5 -> AIXM 5.1 Mapping AIXM 4.5 DP - ESI AIXM 5.1 DP - HMI SDDO 4.5 SDDO Business Logic and AIXM 5.1 Database 5.1 INO-DU INO-DU I/F CORE AIXM 5.1 -> INSPIRE Mapping INSPIRE Data User AIMSL WMS

12 EAD AIXM 5.1 Implementation 12 Data Maintenance Principles Data maintenance is done only in the appropriate system. This means that AIXM 4.5 data is handled in SDO (4.5) while AIXM 5.1 data is handled in SDO (5.1). This includes the HMI as well as uploads via ESI and IFS. The synchronisation is done via dedicated system interfaces between SDO (4.5) and SDO (5.1); backwards download (5.1 -> 4.5) shall be limited, e.g. ad-hoc SNAPSHOT Minor updates in the SDO (4.5) system to enable data model compatibility: new business rules, new DHOs It is not possible to have mixed slots, the slot-handling for 4.5 slots is done in SDO (4.5) while the equivalent handling for the 5.1 slots is done in SDO (5.1). Slot-operations are therefore only possible in the system where the slot has been created originally. The mapping shall be robust enough not to lead to any error in the counterpart system (mapping & business rules).

13 EAD AIXM 5.1 Implementation 13 AIXM 5.1 Business Rules

14 EAD AIXM 5.1 Implementation 14 EAD AIXM 5.1 Business Rules Based on the AIXM 5.1 Business RulesAIXM 5.1 Business Rules Will be transposed into EAD AIXM 5.1 Business Rules Using SBVR - Semantics of Business Vocabulary and Business Rules Will be developed progressively with the implementation of the upload packages (i.e. starting with Release 7 – May 2012) Will contain both Static Data rules and Digital NOTAM Event Specification Rules

15 EAD AIXM 5.1 Implementation 15

16 EAD AIXM 5.1 Implementation 16


Download ppt "The European Organisation for the Safety of Air Navigation EAD AIXM 5.1 Implementation Razvan Guleac DNM/COO/NOM/ADM AIXM 5.1 Seminar."

Similar presentations


Ads by Google