The European Organisation for the Safety of Air Navigation Moving Towards an Integrated ASM/ATFCM/ATS Approach ADR Developments 20-21 Sep 2012 Nil AGACDIKEN.

Similar presentations


Presentation on theme: "The European Organisation for the Safety of Air Navigation Moving Towards an Integrated ASM/ATFCM/ATS Approach ADR Developments 20-21 Sep 2012 Nil AGACDIKEN."— Presentation transcript:

1 The European Organisation for the Safety of Air Navigation Moving Towards an Integrated ASM/ATFCM/ATS Approach ADR Developments Sep 2012 Nil AGACDIKEN ADR Programme Manager

2 Official vs. Operational Data Annex 15 Operations

3 Access interface (B2B –B2C) Interface (B2B –B2C) D > 1 week Static AIRAC data NOTAM NOTAM/ RAD AIP + NOTAM e-RAD AIXM SDO AIXM / INO Static Data AISP ANSP RAD AIP e-RAD ADR Data Processing Data Provision Output

4 Traffic restrictions e-ASM AIXM 5.1extensions e-RAD AIXM AUP UUP e-AMI ANSP AMC Data Provision Access interface (B2B –B2C) Interface (B2B –B2C) D > 1 day Static AIRAC data NOTAM NOTAM/ RAD AIP + NOTAM e-RAD AIXM SDO AIXM / INO Static Data AISP ANSP e-RAD Upd. EAUP e-AMI RAD AIP e-RAD ADR Data Processing D > 1 week Output

5 Traffic restrictions e-ASM AIXM 5.1extensions e-RAD AIXM AUP UUP e-AMI ANSP AMC Access interface (B2B –B2C) Interface (B2B –B2C) D > 3 hours EOBT Static AIRAC data NOTAM NOTAM/ RAD AIP + NOTAM e-RAD AIXM SDO AIXM / INO Static Data AISP ANSP Airport ATS Taxi times, Runway in use Airspace Activation e-RAD Upd. EAUP e-AMI RAD AIP e-RAD ADR Data Processing Output D > 1 day D > 1 week

6 Data Catalogue listing the required data elements released This catalogue and its annexes will be used as a basis to develop B2B ADR data download services (FB 441) AIXM modeling issues are being addressed (i.e. TV, sector configuration etc) ADR extension of AIXM 5.1 is released to cover CFMU 16 ADR developments ADR Developments on Data Management Activities

7 ADR Data Catalogue

8 Data provision Data Repository Consolidation process Interface Format Formal Arrangements Status on Data Management IAIP data IAIP data SDO AIXM data set B2B B2C EAD... CFMU CIAM AUP/UUP CACD AIXM 5.1 (e-AMI) B2B B2C ATFCM No formal arrangements Restrictions Ops. Airspace CACD Manual ATM static ATM static AIXM CFMU SDO Data Completeness Is the main focus Improvement of Data Provision means is the main focus Data Consistency with SDO is the main focus

9 EAD/SDO Data Alignment Exercise Major progress has been made on the data alignment and harmonization activity between EAD/SDO & CACD Data alignment exercise started in March 2010 Data concerned are: AD, PT, AS and RT (only enroute. TPs are not part of the minimum SDO data set ) Amount of data in CACD: AD :7852 PT: AS: 7921 RT: 4603 Area coverage : limited to ECAC+ Status on Data Management

10 Status on Data Alignment Inconsistencies Aerodrome -Natural key ID (missing in one of the databases) -coordinates problems -At start 822 ADs, today 67 ADs Pending issues -Software improvement ( AD collocated with AD or PT) -Military AD, private AD (not published in EAD) -Still few coordinates problems

11 Points -Natural key ID (missing in one of the databases) -type for NAVAIDS (VOR, NDB, ILS,..) -coordinates problems -At start 2252 PT, today 758 PT (715 require extension of min SDO dataset) Pending issues -Software improvement ( PT collocated with AD or with other PT) -Military PT, VFR PT, AD points (not published in EAD) -coordinates problems !! TPs not being part of the minimum SDO dataset, AD navaids (Llz, Ils,Loc,..) are missing in SDO Status on Data Alignment

12 Milestones AD: Data issues under control. Software CR to finish the work (CFMU 17 release) PT: Data issues finished by AIRAC 12 Jan Software CR to finish the work (CFMU 17 release) AS: Analyze and data correction by End RT: Analyze and data correction by End 2012 Status on Data Alignment

13 e-RAD Operational e-AMI pilot phase EAUP on NOP 2012 EAD R6E1 CFMU 15.5 CFMU 16 CFMU 16.5 ADR Related Release Developments Corrections for FB 441/432 ( FB 566) Enabling interoperability with ASM tools (FB 432) Access to AIXM aligned operational data (FB 441) Publication of FRA/DCT restrictions with e-RAD e-Restrictions via ftp e-AMI operational

14 Airspace Requests Requested Confirmed Accepted Earmarked In Queue Allocated Reference Allocated ADR Airspace Request 3 1 AIRAC: Base definitions + Airspace Available (FB 441) 2 CDR 1 & Airspace Availability Live Updates (FB 510) Airspace Allocation / Route Opening & Closure ETFMS AMC ASM Tool 6 ( OPS deployed) eAMI EAUP IFPS ADR Developments enabling ASM Process 4 AUP/UUP (FB 432/FB 566) (FB 572) 5

15 NM operations CACD EAD Interoperability between EAD and CACD (FB569 – NM17, FB511 – NM18) Remote provision of ATM / non-AIP data (FB532 – NM18) Publication of ATM Data through ADR: Live Updates (FB510 – NM17.5) and New Data (FB567 – NM18) NOP Access Layer Prepare Ops Deployment with ASM tools (FB572 – NM17) ADR Road Map

16 ADR Safety Case development started in Feb 2012 in order to demonstrate the level of data quality going out from CACD downstream FHA Workshop took place on 25 April 2012 FHA/PSSA report delivered Status on ADR Developments