Presentation is loading. Please wait.

Presentation is loading. Please wait.

Nile Basin Initiative SOCIO-ECONOMIC DEVELOPMENT & BENEFIT SHARING PROJECT (SDBS)

Similar presentations


Presentation on theme: "Nile Basin Initiative SOCIO-ECONOMIC DEVELOPMENT & BENEFIT SHARING PROJECT (SDBS)"— Presentation transcript:

1 Nile Basin Initiative SOCIO-ECONOMIC DEVELOPMENT & BENEFIT SHARING PROJECT (SDBS)

2 INTRODUCTION 15 Treaties with Nile Basin countries. More than 100 years old. African states independence in the 60’s Paradigm shift. Early attempts. Nile Basin Initiative.

3 NILE BASIN INITIATIVE Launched in 1999 10 Nile Basin countries: Egypt Egypt Sudan Sudan Ethiopia Ethiopia Kenya Kenya Tanzania Tanzania Democratic Republic of Congo Democratic Republic of Congo Eriteria Eriteria Rwanda Rwanda Burundi Burundi Uganda Uganda

4 INITIATIVE ORGANIZATION STRUCTURE Council of Ministers (Nile-CM) Technical Advisory Committee (Nile-TAC) Secretariat (Nile-SEC)

5 SHARED VISION To achieve sustainable socio-economic development through equitable utilization of, and benefit from, the common Nile To achieve sustainable socio-economic development through equitable utilization of, and benefit from, the common Nile

6 SHARED VISION PROGRAMS Eastern Nile Subsidiary Action Program (EN-SAP) Nile Equatorial Lakes Subsidiary Action Program (NEL-SAP) Shared Vision Program (SVP)

7 SAP Programs Promotes the shared vision through subregional INVESTMENTS projects Promotes the shared vision through subregional INVESTMENTS projects

8 EASTERN NILE SUBSIDIARY ACTION PROGRAM (ENSAP) EgyptSudanEthiopia

9 NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP) BurundiDRCEgyptKenyaRwandaSudanTanzaniaUganda

10 SHARED VISION PROGRAM Main task is to create an enabling environment for cooperative investments within a basin-wide framework. Grant-funded - $137 million total cost. 8 Projects

11 SHARED VISION PROGRAM PROJECTS 4 Thematic Projects: Nile Transboundary Environment Action. Nile Basin Regional Power Trade Efficient Water Use for Agriculture Production. Water Resources Planning and Management

12 SHARED VISION PROGRAM PROJECTS, continued. 3 Facilitative projects: Confidence Building and Stakeholder Involvement Applied Training. Socio-Economic Development & Benefit Sharing

13 SHARED VISION PROGRAM PROJECTS, continued. 1 Coordination Project SVP Coordination.

14 PROJECT ORGANIZATION STRUCTURE For each Project: Steering Committee (SC). Project Management Unit (BMU)

15 SOCIO-ECONOMIC DEVELOPMENT AND BENEFITS SHARING (SDBS) PROJECT 2 Components: Nile Transboundary Development Network (NTDN) Nile Transboundary Development Facility (NTDF)

16 NILE TRANSBOUNDARY DEVELOPMENT NETWORK (NTDN) 8 Participating Institutions (PIs) From Egypt : INP

17 WORK PROGRAM, 2006 National Workshop Cluster Workshop Detailed Work Program to follow


Download ppt "Nile Basin Initiative SOCIO-ECONOMIC DEVELOPMENT & BENEFIT SHARING PROJECT (SDBS)"

Similar presentations


Ads by Google