Presentation is loading. Please wait.

Presentation is loading. Please wait.

EUROPEAN COMMISSION Laura LIGUORI 8 – 10 APRIL 2008, PENANG, MALAYSIA ASEAN REGIONAL FORUM SEMINAR ON ANTI-PERSONNEL MINES.

Similar presentations


Presentation on theme: "EUROPEAN COMMISSION Laura LIGUORI 8 – 10 APRIL 2008, PENANG, MALAYSIA ASEAN REGIONAL FORUM SEMINAR ON ANTI-PERSONNEL MINES."— Presentation transcript:

1 EUROPEAN COMMISSION Laura LIGUORI 8 – 10 APRIL 2008, PENANG, MALAYSIA ASEAN REGIONAL FORUM SEMINAR ON ANTI-PERSONNEL MINES

2 FRAMEWORK OF THE EU MINE ACTION (MA) Universalisation and Implementation of the Ottawa Convention (1997) ratified by 156 countries ratified by 156 countries EU MA GENERAL OBJECTIVE  To assist countries affected by landmines and unexploded ordnance  To restore the conditions necessary for the security of their populations and their economic and social development, hence to enhance HUMAN SECURITY

3 EU MA ENVIRONMENT EU ACTORS COUNCIL OF THE EU/ 27 EU MEMBER STATES EUROPEAN COMMISSION EUROPEAN PARLIAMENT EU MA TOOLS MULTI-ANNUAL PROGRAMMING DOCUMENTS JOINT ACTIONS REGULATIONS STRATEGIES

4 THE 5 PILLARS OF EC MA REHABILITATION AND SOCIO-ECONOMIC RE-INTEGRATION MINE RISK EDUCATION CLEARANCE OF MINED AREAS APL STOCKPILE DESTRUCTION MINE VICTIM ASSISTANCE

5 2002-2006 EC MA ENGAGEMENT 42 countries assisted around the world: Afghanistan Albania Angola Armenia Azerbaijan Belarus BiH Burundi Cambodia Chile Colombia Croatia Cyrpus DRC Ecuador Eritrea Georgia Guinea-Bissau Honduras Indonesia Iraq Jordan Kosovo Kyrgyzstan Laos Lebanon Mozambique Myanmar Nicaragua Peru Senegal Somalia Sri Lanka Sudan Tajikistan Tunisia Uganda Ukraine Venezuela Vietnam Yemen

6 EC MA IN 2007 SUDAN GUINEA-BISSAU ETHIOPIA SENEGAL CAMBODIA CYPRUS BELARUS JORDAN LEBANON BOSNIA-HERZEGOVINA

7 2007-2013 THEMATIC INSTRUMENTSGEOGRAPHIC INSTRUMENTS 1.Instrument for Humanitarian Assistance (IHA) 2.Instrument for Stability (IfS) 3.Instrument for Democracy and Human Rights (EIDHR) 1.Instrument for Pre-Accession (IPA) 2.Instrument for Neigbourhood and Partnership (ENPI) 3.Instrument for Development Cooperation (DCI) 4.European Development Fund (EDF) EC MA WAY OF FINANCING

8 EC MA FUNDING 2002 - 2007 (million euro) YEAR TOTAL EC MINE ACTION FUNDING 2007 33 33 2006 65,2 65,2 2005 38 38 2004 46,3 46,3 2003 55,6 55,6 2002 37,3 37,3 TOTAL275,4 1/5 FOR PROJECTS IN SOUTH-EAST ASIA

9 EXAMPLE OF EC FUNDED PROJECTS Humanitarian De-mining and Human Security: LAOS HUMANITARIAN UXO CLEARANCE IN KHAMMOUNE PROVINCE OBJECTIVES To remove all UXO from target sites in order to reduce the threat of death and injury to the population. Through UXO clearance of target sites, to facilitate opportunities for development within the communities, undertaken by communities, other NGOs and local authorities, wishing to deliver wider development activities. To train national staff as skilled clearance and roving team personnel to provide a local UXO clearance capacity.

10 EXAMPLE OF EC FUNDED PROJECTS LAOS EXAMPLE EXAMPLE OF EC FUNDED PROJECTS LAOS EXAMPLE PROJECT PERIOD JANUARY 2006 – MARCH 2008 RESULTS AREA CLEARED – 889 835 m 2 UXO REMOVED – 4 819 Estimated beneficiaries – 2 478 AREA CLEARED – 889 835 m 2 UXO REMOVED – 4 819 Estimated beneficiaries – 2 478 EC CONTRIBUTION 1,000,000 EURO PROJECT FACT SHEET IMPLEMENTED BY

11 INTEGRATING MA INTO DEVELOPMENT CAMBODIA EXAMPLE INTEGRATING MA INTO DEVELOPMENT CAMBODIA EXAMPLE ECONOMIC AND SOCIAL RELAUNCH OF NORTHERN PROVINCES (ECOSORN) CONTRIBUTE TO POVERTY REDUCTION THROUGH INCREASED HOUSEHOLD INCOME AND AGRICULTURAL PRODUCTION ECONOMIC AND SOCIAL DEVELOPMENT OF THE RURAL POPULATION IN 3 NORTH-WEST PROVINCES OF CAMBODIA 5 YEARS COMMENCING SEPTEMBER 2005 PROGRAMME TITLE DURATION OBJECTIVE PURPOSE

12 INTEGRATING MA INTO DEVELOPMENT CAMBODIA INTEGRATING MA INTO DEVELOPMENT CAMBODIA MA PROJECT LAUNCHED IN NOVEMBER 2007 ENABLE SAFER AND PERMANENT ACCESS TO ARABLE LAND AND SOCIAL INFRASTRUCTURES SAFER ACCESS TO ARABLE LANDS AND SOCIAL INFRASTRUCTURES THROUGH IMPLEMENTATION OF MINE RISK REDUCTION STRATEGIES WITH RELATED ACTIVITIES FOR ECOSORN PROGRAMME WITHIN ECOSORN DEVELOPMENT PROGRAMME PROJECT TITLE OBJECTIVE IMPLEMENTATION OF MINE RISK REDUCTION STRATEGIES AND DE-MINING TOOLS

13 CONCLUSIONS DECIDE THE DEGREE OF IMPORTANCE GIVEN TO MA REQUEST FOR EC ASSISTANCE NEEDS IDENTIFICATION ROLE OF THE MINE-AFFECTED EC PARTNERS

14 CONCLUSIONS The EC is a significant donor in the field of mine action. From 2002-2007 EC has committed more than € 275 Million for Mine action worldwide (more than € 1,5 Million for the EU as a whole). EC approach will continue to consider landmines and explosive remnants of war (ERW) within a broader context of humanitarian assistance as well as long-term and sustainable socio-economic development programmes. HUMAN SECURITY DEVELOPMENT

15 EUROPEAN COMMISSION


Download ppt "EUROPEAN COMMISSION Laura LIGUORI 8 – 10 APRIL 2008, PENANG, MALAYSIA ASEAN REGIONAL FORUM SEMINAR ON ANTI-PERSONNEL MINES."

Similar presentations


Ads by Google