Presentation is loading. Please wait.

Presentation is loading. Please wait.

South Cambridgeshire District Council Northstowe A Proposed New Town in Cambridgshire.

Similar presentations


Presentation on theme: "South Cambridgeshire District Council Northstowe A Proposed New Town in Cambridgshire."— Presentation transcript:

1 South Cambridgeshire District Council Northstowe A Proposed New Town in Cambridgshire

2 South Cambridgeshire District Council History Proposed new town of Northstowe, promoted by Gallagher Estates and the new Homes and Communities Agency The development is to be an “exemplar” in sustainability and has been labelled a “proto- type Eco-Town”

3 South Cambridgeshire District Council Total development area: 432 hectares, divided into: 189 hectares for residential development (population of 24,000, accommodated within 9,500 new homes) 14 hectares of employment floorspace 23 hectares for town and local centres 22 hectares for schools (6 primary and 1 secondary) The remainder of the land will primarily be open space with proposed sports grounds and play areas. Northstowe - Statistics

4 South Cambridgeshire District Council Northstowe Constraints Midlands and the North London and the South- East Ipswich and Felixstowe

5 South Cambridgeshire District Council Northstowe - Low Emissions SCDC will aim to: Accelerate uptake of low emission fuels and technologies alongside design options, travel planning and public transport infrastructure proposals

6 South Cambridgeshire District Council Mitigation Measures Highways Agency proposed improvements to the A14 Widening Parallel link road Re-alignment Current status: informal consultation period prior to publication of draft orders expected Spring 2009 Expected construction phase: 2010 - 2015

7 South Cambridgeshire District Council Public Transport Initiative Completion of the Cambridgeshire Guided Busway (CGB)  Proposed to link Huntingdon to Cambridge City Centre, following parallel route to the A14 along disused railway  Stops will be located at all major settlements along the route  Northstowe to be built to make full use of the CGB with 5 dedicated stops through the development  Expected to cause a reduction in private vehicle journeys and improve the A14  Expected to open Spring 2009

8 South Cambridgeshire District Council Proposed Section 106 Air quality monitoring within the existing, neighbouring communities Creation of a community website focussed on pollution issues arising from the development

9 South Cambridgeshire District Council Proposed Section 106 cont. Provision of high quality cycle, pedestrian and equestrian routes Travel plan framework and dedicated co- ordinator Interim measures to maintain A14 level of service Construction traffic agreement

10 South Cambridgeshire District Council Proposed Section 106 cont. Transport telemetric system - development of real time passenger information Provision of charging points for electric vehicles primarily for street cleansing trucks and mechanical sweepers

11 South Cambridgeshire District Council Development Timescales Revised Application expected - Jan 2010 Grant outline permission – July 2010 (subject to s.106) Design Code & first detail application – November 2010 First Occupation - Summer 2011 (?)


Download ppt "South Cambridgeshire District Council Northstowe A Proposed New Town in Cambridgshire."

Similar presentations


Ads by Google