Presentation is loading. Please wait.

Presentation is loading. Please wait.

WorldSID 5 th TEG ISO WorldSID 50 th Group Summary of Meetings 16 March 2012 London, UK.

Similar presentations


Presentation on theme: "WorldSID 5 th TEG ISO WorldSID 50 th Group Summary of Meetings 16 March 2012 London, UK."— Presentation transcript:

1 WorldSID 5 th TEG ISO WorldSID 50 th Group Summary of Meetings 16 March 2012 London, UK

2 The Chairs and members of the 5 th TEG and the ISO 50 th Group wish to thank – Allan McKenzie and the SMMT for providing the room and facilities for the meetings B. Frost for making the connection with Mr. McKenzie and the SMMT Humanetics for providing the WebEx capability The Chairs and members of the 5 th TEG and the ISO 50 th Group wish to thank – Allan McKenzie and the SMMT for providing the room and facilities for the meetings B. Frost for making the connection with Mr. McKenzie and the SMMT Humanetics for providing the WebEx capability Thank you

3 Both the 5 th and the 50 th groups met in-person and by WebEx Morning and afternoon sessions were held A great deal of information was presented by several laboratories There was insufficient time to absorb and process all of the new information – few decisions were made! An additional meeting in April is planned because there is so much new material to deal with. Both the 5 th and the 50 th groups met in-person and by WebEx Morning and afternoon sessions were held A great deal of information was presented by several laboratories There was insufficient time to absorb and process all of the new information – few decisions were made! An additional meeting in April is planned because there is so much new material to deal with. Overview

4 Summary 5 th Items A data and presentation archive has been created on the UVa Colab site. Password required Bruce Donnelly is the administrator if interested VRTC biofidelity test data In progress – both ISO and NHTSA biofidelity tests will be conducted. Reproducibility issues between two 5 th dummies, however Left and Right repeatability looks good. A data and presentation archive has been created on the UVa Colab site. Password required Bruce Donnelly is the administrator if interested VRTC biofidelity test data In progress – both ISO and NHTSA biofidelity tests will be conducted. Reproducibility issues between two 5 th dummies, however Left and Right repeatability looks good.

5 5 th continued TRL testing ISO Biofidelity tests in progress High speed flat wall tests may be too severe? TRL ran at slower speeds This is not unlike SIDIIs biofidelity testing Specific durability concerns with high speed tests: IRTRACC rotation limitations and durability (already resolved by HIS) Shoulder contact with combined lateral and vertical motion (under investigation, may not be problem in crash tests) Pelvis iliac wing contact with S-I load cell (current redesign helped but did not eliminate issue) TRL testing ISO Biofidelity tests in progress High speed flat wall tests may be too severe? TRL ran at slower speeds This is not unlike SIDIIs biofidelity testing Specific durability concerns with high speed tests: IRTRACC rotation limitations and durability (already resolved by HIS) Shoulder contact with combined lateral and vertical motion (under investigation, may not be problem in crash tests) Pelvis iliac wing contact with S-I load cell (current redesign helped but did not eliminate issue)

6 5 th continued TRL testing – continued Normalization of 50 th and 5 th response using ISO 12350 methodology ISO 12350 worked well for scaling test severities. ISO 12350 worked less well for scaling dummy sizes. ISO 12350 did not work well for time components. Preliminary Report on Transport Canada full vehicle crash tests with WorldSID 5 th In some tests the HIC was low but BRIC was high. In other cases the two criteria more closely correlated TRL testing – continued Normalization of 50 th and 5 th response using ISO 12350 methodology ISO 12350 worked well for scaling test severities. ISO 12350 worked less well for scaling dummy sizes. ISO 12350 did not work well for time components. Preliminary Report on Transport Canada full vehicle crash tests with WorldSID 5 th In some tests the HIC was low but BRIC was high. In other cases the two criteria more closely correlated

7 50 th and 5 th Pelvis Flesh Interference Both the WorldSID 5 th and WorldSID 50 th demonstrate contact between bottom rib and pelvis flesh in certain seating positions.

8 Pelvis Flesh Interference has been evaluated by several groups: EuroNCAP workshop Evaluated WorldSID 50 th Interference can be achieved in certain seating positions TRL Evaluated WorldSID5th Pelvis flesh tucked behind rib (difficult to achieve) Pelvis flesh in front of rib (easier to achieve) Pelvis flesh cut away (possible redesign countermeasure) Both interference conditions did restrict rib rotation. Pelvis Flesh Interference has been evaluated by several groups: EuroNCAP workshop Evaluated WorldSID 50 th Interference can be achieved in certain seating positions TRL Evaluated WorldSID5th Pelvis flesh tucked behind rib (difficult to achieve) Pelvis flesh in front of rib (easier to achieve) Pelvis flesh cut away (possible redesign countermeasure) Both interference conditions did restrict rib rotation. 50 th and 5 th Pelvis Flesh Interference

9 Pelvis Flesh Interference has been evaluated by several groups: MCW Evaluated WorldSID50th Pendulum tests with flesh in front of pelvis Some restriction of rib rotation Sled tests with interference (planned) Pendulum / sled tests with cut-away flesh (planned) PDB (Daimler) Evaluated WorldSID 50 th Pendulum tests suggested small affect of interference on deflection (approx. 1.5 mm). (rotation not measured.) Pelvis Flesh Interference has been evaluated by several groups: MCW Evaluated WorldSID50th Pendulum tests with flesh in front of pelvis Some restriction of rib rotation Sled tests with interference (planned) Pendulum / sled tests with cut-away flesh (planned) PDB (Daimler) Evaluated WorldSID 50 th Pendulum tests suggested small affect of interference on deflection (approx. 1.5 mm). (rotation not measured.) 50 th and 5 th Pelvis Flesh Interference

10 Pelvis Flesh Interference has been evaluated by several groups: Humanetics Pending MCW sled tests – will redesign flesh geometry to reduce interference for WorldSID 5 th and WorldSID 50 th. Pelvis biofidelity tests for other reasons (material changes) will wait until geometry is resolved. Pelvis Flesh Interference has been evaluated by several groups: Humanetics Pending MCW sled tests – will redesign flesh geometry to reduce interference for WorldSID 5 th and WorldSID 50 th. Pelvis biofidelity tests for other reasons (material changes) will wait until geometry is resolved. 50 th and 5 th Pelvis Flesh Interference

11 Summary 50 th Items MCW analysis & testing Re-analysis of thoracic chestband deflection with spinal origin Spinal origin approx. 23% forward of most posterior position Analysis suggests differences in deflection not a great as anticipated. MCW analysis & testing Re-analysis of thoracic chestband deflection with spinal origin Spinal origin approx. 23% forward of most posterior position Analysis suggests differences in deflection not a great as anticipated.

12 Summary 50 th Items Material Changes Japan Green Project and European Reach Project driving material changes in WorldSID and all dummies: WorldSID blue damping material: OK no changes Ureol ( WS skull and iliac): replacement identified Hyperlast (WS pelvis flesh): replacement needed Vinyl plasticizer: may affect all vinyls, all dummies Material Changes Japan Green Project and European Reach Project driving material changes in WorldSID and all dummies: WorldSID blue damping material: OK no changes Ureol ( WS skull and iliac): replacement identified Hyperlast (WS pelvis flesh): replacement needed Vinyl plasticizer: may affect all vinyls, all dummies

13 Summary 50 th Items Miscellaneous Tilt sensor Discrepancy with pelvis tilt sensor has been solved by Humanetics Requires changes to mounting block External Dimensions Preliminary procedure is complete. Humanetics waiting for labs to respond with feedback. Miscellaneous Tilt sensor Discrepancy with pelvis tilt sensor has been solved by Humanetics Requires changes to mounting block External Dimensions Preliminary procedure is complete. Humanetics waiting for labs to respond with feedback.

14 Future Plans Next meeting April WebEx – Doodle invitation May WebEx – 8 May 2012, 7:00AM Eastern US DST Next meeting April WebEx – Doodle invitation May WebEx – 8 May 2012, 7:00AM Eastern US DST


Download ppt "WorldSID 5 th TEG ISO WorldSID 50 th Group Summary of Meetings 16 March 2012 London, UK."