1 Indira Awaas Yojana Workshop on Enabling DBT 31 st July, 2013

2 Pre requisites for eFMS Complete electronic database of beneficiaries All transactions to be made through AwaasSoft Other States to develop bridge software Operationalisation of e-FMS module

3 Beneficiary database on AwaasSoft Registration of all beneficiaries in the Five year priority list (updated /revised permanent waitlist) Beneficiary profiles should be complete in all respects Entry of Bank/ Post Office Account number – Use of NREGA Bank account nos. wherever available Seeding of Aadhaar/TIN numbers if available Registration of these beneficiaries for Aadhaar numbers through a camp approach

4 Use of MIS Progress is still slow – transactions not done through MIS and progress not fully reflected Physical transactions to follow online transactions Financial and physical progress on MIS should reflect ground reality Moving away from Monthly reporting to real time reporting Monitoring and reporting through AwaasSoft

5 Year Annual Target Registered in Mis Consolidated At block Sanctioned Order Sheet Generated 1 st Installment released Inspection At Lintel Level 2 nd Installment released Inspection At Completion level 3 rd Installment released 2012-133010391320021622508502171646150041116589002732692520612321557571 2013-14 24807159794244975814251472579331856144167700 Status of data entry in AwaasSoft

6 Status of data entry for 2012-13 (as on 30.07.2013) State Annual Target Central Scheme Number of Houses Registered in Mis Consolidated At blockSanctioned Order Sheet Generated 1 st Installment released Inspection At Lintel Level 2 nd Installment released Inspection At Completion level 3 rd Installment released ANDHRA PRADESH 27039922185010000000 BIHAR 8163051239031838287816257442571655991429791930410181951 CHHATTISGARH 415117146565140634805426644666740733922610 GOA 1714000000000 GUJARAT 13647010053096965963767229274646978394457181977 HARYANA 198541913518736186651666916900647091053139590 HIMACHAL PRADESH 627165736364635555406147117731746341641 JAMMU & KASHMIR 1947671105082448930822675243183210 JHARKHAND 6950310979210198199902839158369213614124661763569 KARNATAKA 1072101293300000

7 Status of data entry for 2012-13 (as on 30.07.2013) State Annual Target Central Scheme Number of Houses Registered in Mis Consolidated At blockSanctioned Order Sheet Generated 1 st Installmen t released Inspection At Lintel Level 2 nd Installmen t released Inspection At Completio n level 3 rd Installmen t released KERALA5962055121527995236440294382681156310951961407 MADHYA PRADESH843588593181089793156647859473825283960 MAHARASHTRA1673791764111739401729251493051644016182899769622337018 ODISHA1553631493811309341280717837266181438137220795 PUNJAB236961600000000 RAJASTHAN685788521384706842256289884091347563649941683983 TAMIL NADU1114101116741073901070159710680888287787790 UTTAR PRADESH368322244354218524202426158371135477271941606126481279 UTTARAKHAND1716214552133261269111205119435889419266 WEST BENGAL21955331802510330885569450503066065572697230

8 Status of data entry for 2012-13 (as on 30.07.2013) State Annual Target Central Scheme Number of Houses Registered in Mis Consolidated At blockSanctioned Order Sheet Generated 1 st Installment released Inspection At Lintel Level 2 nd Installment released Inspection At Completion level 3 rd Installment released ARUNACHAL PRADESH8339000000000 ASSAM1844081434731274101215891022499537536907245668436335 MANIPUR7238240512321064106200000 MEGHALAYA1260811604940280762762233729024080 MIZORAM2687256618101801145212871506364740 NAGALAND8343353500000000 SIKKIM15961754159515949800000 TRIPURA16245184061064572195215372219633414720 ANDAMAN AND NICOBAR264620994 10000 DADRA & NAGAR HAVELI441700000000 DAMAN & DIU197000000000 LAKSHADWEEP17180 62790000 PUDUCHERRY1318111000000

9 Status of data entry for 2013-14 (as on 30.07.2013) State Annual Target Central Scheme Number of Houses Registered in Mis Consolidated At blockSanctioned Order Sheet Generated 1 st Installment released Inspection At Lintel Level 2 nd Installment released Inspection At Completion level 3 rd Installment released ANDHRA PRADESH207313222100000 BIHAR6055506438754004153646252356171721984121800 CHHATTISGARH480044295817521087000000 GOA1393511000000 GUJARAT10788056071400770000000 HARYANA1802917383133661167298448505044600 HIMACHAL PRADESH70643000000000 JAMMU & KASHMIR1595210051000000 JHARKHAND67153414547000000 KARNATAKA87816000000000

10 Status of data entry for 2013-14 (as on 30.07.2013) State Annual Target Central Scheme Number of Houses Registered in Mis Consolidated At blockSanctioned Order Sheet Generated 1 st Installmen t released Inspection At Lintel Level 2 nd Installmen t released Inspection At Completio n level 3 rd Installmen t released KERALA457382172150813352960000 MADHYA PRADESH11293649301720000000 MAHARASHTRA137314161178422172679358617601300 ODISHA1280571341393300000 PUNJAB19531200000000 RAJASTHAN854605051226092166331122545500000 TAMIL NADU88436205421930000000 UTTAR PRADESH2972239327593020576281790000 UTTARAKHAND14012300926050000000 WEST BENGAL1855943959106414000000

11 Status of data entry for 2013-14 as on 30.07.2013 State Annual Target Central Scheme Number of Houses Registered in Mis Consolidated At blockSanctioned Order Sheet Generated 1st Installment released Inspection At Lintel Level 2 nd Installmen t released Inspection At Completio n level 3 rd Installmen t released ARUNACHAL PRADESH6870000000000 ASSAM1386957443180000000 MANIPUR8011000000000 MEGHALAYA138651097526960000000 MIZORAM366131997 000000 NAGALAND10439600000000 SIKKIM14363300000000 TRIPURA13368000000000 ANDAMAN AND NICOBAR2081100000000 DADRA & NAGAR HAVELI419000000000 DAMAN & DIU162000000000 LAKSHADWEEP188000000000 PUDUCHERRY1065000000000

12 Electronic Fund Management System AwaasSoft captures flow of funds from MoRD to beneficiary account eFMS enables electronic transfer to the beneficiary account from the payment authority (District/Block/GP) Involves Verification and freezing of beneficiary account details Use of digital signatures by designated payment authority to generate and approve Fund Transfer Orders (FTO) FTO to be sent to bank for clearance and transfer of funds into beneficiary account

13 Operationalisation of e-FMS Mapping of Aadhaar & Bank Account number Verification & freezing of mapped account numbers Fixing the number of instalments and quantum of assistance in each Identification of payment authority Procurement & distribution of Digital signatures Capacity building at ground level Roll out plan needs to be devised

14 Points for discussion Issues related to AwaasSoft – Operational – Technical – Action plan for updation Preparedness for eFMS – Support required from GoI – Steps needed time limits Level of support from State and District NIC setups Measures required for Aadhaar Seeding

15 Thank you