Presentation is loading. Please wait.

Presentation is loading. Please wait.

CHAPTER 11 The Basics of Capital Budgeting

Similar presentations


Presentation on theme: "CHAPTER 11 The Basics of Capital Budgeting"— Presentation transcript:

1 CHAPTER 11 The Basics of Capital Budgeting
Should we build this plant?

2 Capital Budgeting? Analysis of potential additions to fixed assets
Long-term decisions Large expenditures Important to future Strategy Growth

3 Steps to capital budgeting
Estimate Cash Flows (inflows & outflows). Assess riskiness of Cash Flows. Determine appropriate cost of capital. Find NPV and/or IRR. Accept if NPV > 0 OR IRR > WACC.

4 Methods NPV -- Net Present Value IRR -- Internal Rate of Return
Use cost of capital as Discount Rate IRR -- Internal Rate of Return Solve for Discount Rate Payback Method How long to recoup money invested

5 Projects Independent VS Mutually Exclusive
Independent projects Cash flows of one are unaffected by the acceptance of the other Mutually exclusive projects Cash flows of one can be adversely impacted by the acceptance of the other.

6 Difference between normal and non-normal cash flow streams
Normal cash flow stream Cost (negative CF) followed by a series of positive cash inflows. One change of signs. Non-normal cash flow stream Two or more changes of signs. Most common: Cost (negative CF), then string of positive CFs, then cost to close project. Nuclear power plant, strip mine, etc.

7 Time line

8

9 Net Present Value (NPV)
Sum of the PVs of all cash inflows and outflows of a project:

10 Compare 2 Proposals Year CF Proj A CF Proj B 0 -100 -100 1 10 20

11 Project A: NPV Year CFt PV of CFt 0 -100 -$100 1 10 2 60 3 80 NPVL =
$100 NPVL = Discount Rate: 10%

12

13 Project A: NPV Year CFt PV of CFt 0 -100 -$100 1 10 9.09 2 60 49.59
$100 NPV = $18.79 Discount Rate: 10% 13

14 Project B: NPV Year CF PV of CF 0 -100 -$100.00 1 20 18.18 2 70 57.85
$100.00 NPV = $21.11 14

15 Solving for NPV: Financial calculator solution
Enter CFs into the calculator’s CFLO register. CF0 = -100 CF1 = 10 CF2 = 60 CF3 = 80 Enter I/YR = 10, press NPV button to get NPVL = $18.78.

16 Rationale for the NPV method
NPV = PV of inflows – Cost = Net gain in wealth Independent Projects: Accept if project NPV > 0 Mutually Exclusive Projects: Accept projects with highest positive NPV, those that add most value

17 Internal Rate of Return (IRR)
IRR is the discount rate that forces PV of inflows equal to cost, and the NPV = 0: Solving for IRR with a financial calculator: Enter CFs in CFLO register. Press IRR; IRRL = 18.13% and IRRS = 23.56%.

18 Internal Rate of Return (IRR)
IRR is the discount rate that forces PV of inflows equal to cost, and NPV = 0: 18

19 How is a project’s IRR similar to a bond’s Yield to Maturity (YTM)
Same thing Think of a bond as a project. YTM on the bond is IRR of the “bond” project. EXAMPLE: Suppose a 10-year bond with a 9% annual coupon and $1,000 par value sells for $1, Solve for IRR = YTM = 7.08%, the annual return for this project/bond.

20 Rationale for the IRR method
If IRR > WACC, project’s return exceeds its costs and there is some return left over to boost stockholders’ returns. If IRR > WACC, accept project. If IRR < WACC, reject project. If projects are independent, accept both Projects, as both IRR > WACC = 10%. If projects are mutually exclusive, accept Project with higher IRR

21 NPV Profiles A graphical representation of project NPVs at various different costs of capital. WACC NPV-A NPV-B 0 $50 $50 20 (3.70)

22 Drawing NPV profiles . . . . . . . . . . . S L NPV ($) IRRL = 18.1%
60 . 50 . 40 . Crossover Point = 8.7% . 30 . . IRRL = 18.1% 20 . . S . 10 L IRRS = 23.6% . . Discount Rate (%) 5 10 15 20 23.6 -10

23 Comparing the NPV and IRR methods
Independent Projects: Two methods always lead to the same accept/reject decisions. If projects are mutually exclusive … If WACC > crossover rate, the methods lead to the same decision and there is no conflict. If WACC < crossover rate, the methods lead to different accept/reject decisions.

24 Reasons why NPV profiles cross
Size (scale) differences – the smaller project frees up funds at t = 0 for investment. The higher the opportunity cost, the more valuable these funds, so a high WACC favors small projects. Timing differences – the project with faster payback provides more CF in early years for reinvestment. If WACC is high, early CF especially good, NPVS > NPVL.

25 Reinvestment rate assumptions
NPV method assumes CFs are reinvested at WACC IRR method assumes CFs are reinvested at IRR Assuming CFs are reinvested at the opportunity cost of capital is more realistic, so NPV method is the best. NPV method should be used to choose between mutually exclusive projects. Perhaps a hybrid of the IRR that assumes cost of capital reinvestment is needed.

26 Since managers prefer the IRR to the NPV method, is there a better IRR measure?
Modified Internal Rate of Return Yes, MIRR is the discount rate that causes the PV of a project’s terminal value (TV) to equal the PV of costs. TV is found by compounding inflows at WACC. MIRR assumes cash flows are reinvested at the WACC.

27 Calculating MIRR 66.0 12.1 10% PV outflows -100.0 $100 MIRR = 16.5% 158.1 TV inflows MIRRL = 16.5% $158.1 (1 + MIRRL)3 =

28 Why use MIRR versus IRR? MIRR assumes reinvestment at the opportunity cost = WACC. MIRR also avoids the multiple IRR problem. Managers like rate of return comparisons, and MIRR is better for this than IRR.

29 What is the payback period?
Number of years required to recover a project’s cost, or “How long does it take to get money back?” Calculated by adding project’s cash inflows to its cost until the cumulative cash flow for the project turns positive.

30 Calculating payback Project A -- Payback Calculation CF -100 10 60
1 2 3 CF 80 Cumulative -30 Payback = / = years = 30 80 Payback = years

31 Calculating payback Project B -- Payback Calculation CF -100 20 70
1 2 3 CF 60 Cumulative -10 Payback = / = years = 10 60 Payback = 2.17 years 31

32 Strengths and weaknesses of payback
Provides indication of a project’s risk and liquidity Easy to calculate and understand Weaknesses Ignores time value of money Ignores CFs occurring after the payback period

33 Discounted payback period
Uses discounted cash flows rather than raw CFs. 1 2 3 10% CFt PV of CFt 60.11 Cumulative -41.32 Disc Payback = / = 2.7 years = 41.32 60.11

34 Enter CFs into calculator CFLO register. Enter I/YR = 10.
Project P has cash flows (in 000s): CF0 = -$0.8 million, CF1 = $5 million, and CF2 = -$5 million. Find Project P’s NPV and IRR. , ,000 WACC = 10% Enter CFs into calculator CFLO register. Enter I/YR = 10. NPV = -$ IRR = ERROR Why?

35 Multiple IRRs NPV IRR2 = 400% 450 WACC 100 400 IRR1 = 25% -800

36 Why are there multiple IRRs?
At very low discount rates, the PV of CF2 is large & negative, so NPV < 0. At very high discount rates, the PV of both CF1 and CF2 are low, so CF0 dominates and again NPV < 0. In between, the discount rate hits CF2 harder than CF1, so NPV > 0. Result: 2 IRRs.

37 When to use the MIRR instead of the IRR? Accept Project P?
When there are non-normal CFs and more than one IRR, use MIRR. PV of 10% = -$4, TV of 10% = $5,500. MIRR = 5.6%. Do not accept Project P. NPV = -$ < 0. MIRR = 5.6% < WACC = 10%.


Download ppt "CHAPTER 11 The Basics of Capital Budgeting"

Similar presentations


Ads by Google