1 Performance Tested Comfort System Program Update January 24, 2007.

Similar presentations


Presentation on theme: "1 Performance Tested Comfort System Program Update January 24, 2007."— Presentation transcript:

1 1 Performance Tested Comfort System Program Update January 24, 2007

2 2 PTCS Status Measures Installed Training Quality Assurance Visits Ecos Consulting Perspective Utility Perspective

3 3

4 4 PTCS Measures Installed - Public Utilities 18 Public utilities have reported over 500 measures –FY06*: 182 duct sealing, 115 heat pump –FY07: 199 duct sealing, 43 heat pump *BPA’s fiscal year is Oct 1-Sep 30 State distribution of Public Utilities –Oregon: 365 duct sealing; 125 heat pumps (10% qualify for tax credit) –Washington: 15 duct sealing; 14 heat pumps –Idaho, Kootenai: 1 duct sealing; 10 heat pumps Conservative savings estimate –Duct Sealing + Heat Pump commissioning = 0.2 aMW, to date

5 5 Other Regional Programs Idaho Power duct sealing program: over 430 mobile homes CheckMe: over 130 heat pumps –EWEB –Emerald PUD Other?

6 6 Training Sessions Completed –6 duct sealing –8 heat pump commissioning Requests pending –7 duct sealing –9 heat pump commissioning January 2007, added $17,600 to training budget Contact Jennifer Williamson (503) 525-2700 ext 103 or jwilliamson@ecosconsulting.com Martin Wilson (503) 525-2700 ext 140 or mwilson@ecosconsulting.com

7 7 Future Training To be scheduled –Skamania & Cascade Locks –Idaho Falls (area) –Ravalli & Mission Valley –Canby & Monmouth –Central Lincoln & Drain Work with Northwest Energy Efficiency Alliance to share training –Ellensburg –Port Angeles (duct sealing) –Idaho Falls

8 8 Training Costs Cost Sharing Options (after the first training session) –Flat reimbursement for verified attendance –Training costs shared equally by BPA and participating utilities Utilities are welcome to contact Ecos Consulting directly to arrange self-funded training Certified Technicians are welcome to contact the Alliance regarding other training opportunities and costs

9 9 Quality Assurance Visits Ecos Consulting is preparing a quality assurance (QA) implementation plan –As many as 50 QA visits, based on measures claimed –High volume certified technicians with high savings potential Central Electric EWEB Springfield

10 10 Utility Perspectives What is working Opportunities for improvement PTR system upgrades coming in February