September 2013 www.navarra.es The renovation of the street lighting systems in Navarre XIII European Symposium for the Protection of the Night Sky.

Similar presentations


Presentation on theme: "September 2013 www.navarra.es The renovation of the street lighting systems in Navarre XIII European Symposium for the Protection of the Night Sky."— Presentation transcript:

1 September 2013 www.navarra.es The renovation of the street lighting systems in Navarre XIII European Symposium for the Protection of the Night Sky

2 1. Legal framework 2. Effects of lighting systems 3. Actions by the Administration of Navarre Índice

3 Royal Decree 1890/2008, of November 14th, approving the Regulations of energy efficiency in public ligthing systems and its complementary technical instructions EA-01 a EA-07. Royal Decree 842/2002, of August 2nd, approving the Regulations for low voltage electric systems. 1. Legal framework Navarre Law 10/2005, of November 9th, regulating lighting systems por night environment protection. Navarre Decree 199/2007, of September 17th, approving regulations in accordance to Navarre Law 10/2005.

4 Public lighting = lighting of public areas and ways with the objective of providing adequate visibility for normal activities. Cizur Mayor. A-12 high speed way Pamplona-Estella-Logroño. www.celfosc.org 1. Legal framework

5 2. Effects of lighting systems EFFECTS OF LIGHTING SYSTEMS EFFECTS ON THE ECONOMY EFFECTOS ON THE ENVIRONMENT

6 2. Effects of lighting on the environment  Light pollution  CO2 emissions

7 Energy consumption in Administration and public services in Navarre 1991-2011 (TOE) 2. Effects of lighting on the economy ADMIN. AND PUBLIC SERVICES COAL PETROL PRODUCTS NATURAL GAS ELECTRICITY BIOMASS SOLAR THERMAL

8 Energy expense in Navarra in 2009, 2010 y 2011 (thousands of euros) 2. Effects of lighting on the economy

9 (save energy)

10 2. Effects of lighting on the economy

11 Promenade close to the train station. Before the crisis, both rows of lights were on. As a result of the crisis, only one row is used. Promenade close to the Pamplona road ring. Before the crisis, all lights were on. As a result of the crisis, only one out of two are used.

12  Regional Ministry of Local Administration:  Objective: Promote and develop actions in Municipalities by means of triennial plans.  Subsidized actions: not only public lighting but also other public services related to water, waste management, etc.  Criteria: state of the current lighting system and economic return of the action. 3. Actions by the Administration of Navarre

13  Regional Ministry of Environment:  Objective: Promote and develop actions in Municipalities members of the Network of local sustainable Municipalities  Subsidized actions: public lighting, RES installation, Municipal buildings refurbishment, rural paths...  Criteria : Type of action, budget, documentations submitted and other criteria. 3. Actions by the Administration of Navarre

14  Regional Ministry of Industry:  Objective: Promote renovation of public lighting systems by the Municipalities with energy efficiency criteria.  Subsidized actions  Energy audits of existing lighting systems  Renovation of existing lighting systems with energy efficiency criteria  Criteria:  There has been an evolution from 2006 to 2012 3. Actions by the Administration of Navarre

15  Regional Ministry of Industry: Criteria:  2006-2008: No previous energy audit needed. No specific technology required.  2009: No previous energy audit needed. Renovation by changing to LED required.  2010: No previous energy audit needed. Renovation by changing to LED required or lighting flux regulation systems required.  Staff from the Regional Ministry of Industry meets “Cel fosc” and starts a collaboration period with this association and some independent consultants in lighting systems. All of them work for free, just looking for a better job.  2011: Previous energy audit compulsory. Renovation must follow energy audit recommendations. In addition, the existing installation must be 20 year-old, renovated installation must have “A” energy efficiency label and minimum light pollution. 3. Actions by the Administration of Navarre

16  Regional Ministry of Industry: Other actions:  2012: Study of LED installations in Navarre.  Special action for very small municipalities (less than 200 inhabitants)  The Regional Ministry pays an independent lighting audit for 173 small municipalities in order they can later take measures to improve an save energy.  2012: Handbook on efficient management of public lighting systems. 3. Actions by the Administration of Navarre

17 Public subsidy (euros) Investment (euros) Savings (MWh/año)Number of subsidies 200688.953,00340.738,01400,009 (2 auditorias y 7 inv.) 200789.311,40140.317,49453,00 13 (6 auditorias y 7 inv.) 2008402.374,331.727.489,945.304,00 31 (3 auditorias y 28 inv.) 2009368.865,261.281.240,87601,00 18 (5 auditorias y 13 inv.) 2010448.823,611.433.726,711.137,00 42 (9 auditorias y 33 inversiones) 2011510.625,13983.270,781.003,00 42 (32 auditorias y 14 inv. EELL> 200; 173 auditorias (180.000€) en EELL< 200) Summary of subsidies given by the Regional Ministry of Industry 3. Actions by the Administration of Navarre

18 Thank you for your attention www.navarra.es