Fiscal Year (FY) 2013 National Training and Technical Assistance Cooperative Agreements (NCA) Non-Competing Continuation HRSA 5-U30-13-001 NCA TA Website:

Similar presentations


Presentation on theme: "Fiscal Year (FY) 2013 National Training and Technical Assistance Cooperative Agreements (NCA) Non-Competing Continuation HRSA 5-U30-13-001 NCA TA Website:"— Presentation transcript:

1 Fiscal Year (FY) 2013 National Training and Technical Assistance Cooperative Agreements (NCA) Non-Competing Continuation HRSA 5-U30-13-001 NCA TA Website: http://www.hrsa.gov/grants/apply/assistance/nca

2 Technical Assistance Call Date: Tuesday, March 12, 2013 Time: 1 PM Eastern Dial-In Number: 1-888-946-7304 Participant Passcode: 7083266 Web Meeting Link: https://hrsa.connectsolutions.com/ncanccta A replay will be posted within one week of the call at http://www.hrsa.gov/grants/apply/assistance/nca http://www.hrsa.gov/grants/apply/assistance/nca 2

3 FY 2013 NCA NCC Overview Submission Process Standard Form SF-PPR Budget (Forms & Justification/Narrative) Program Narrative Update Project Work Plan Performance Measures Resources TA Contacts 3

4 Overview NCAs applying for FY 2013 non-competing continuation funding must submit a progress report in the Electronic Handbooks (EHB) FY 2013 begins July 1, 2013 and ends June 30, 2014 Instructions for completing the progress report are available in EHB and on the NCA TA webpage at http://www.hrsa.gov/grants/apply/assistance/nca http://www.hrsa.gov/grants/apply/assistance/nca Progress reports must be submitted in EHB by 5 PM ET on April 24, 2013 Progress reports may not exceed 40 pages 4

5 Submission Process System-generated e-mail notifications that the progress report is available in EHB were sent to NCA Project Directors and other individuals who have non- competing continuation edit and submit privileges in EHB 5

6 NCC Components REQUIRED: Standard Form SF-PPR Standard Form SF-PPR2 Budget Information: Budget Details Form Budget Narrative Form 12: Organization Contacts Project Work Plan Performance Measures Attachment 1: Program Narrative Update As Applicable: Attachment 2: Staffing Plan Attachment 3: Position Descriptions for Key Personnel Attachment 4: Biographical Sketches for Key Personnel Attachment 5: Summary of Contracts/Agreements Attachment 6: Other Relevant Documents 6

7 Budget Forms Section A: Budget Summary The NCA grant request in the federal column is pre-populated and cannot be edited [this figure should correspond with the recommended future support figure (Line 13) on the most recent Notice of Award] Section B: Budget Categories Provide a breakdown of the budgeted funds by Object Class Category (e.g., Personnel, Fringe Benefits) Refer to SF-424A submitted with the most recent NCA application or the Budget Form submitted with the last NCA NCC as a reference point Section C: Non-Federal Resources Do not provide other sources of funding 7

8 Budget Narrative Provide a detailed line- item budget that explains each cost for the upcoming budget period (July 1, 2013 through June 30, 2014) Additional narrative for the budget justification should describe each cost element and explain how each contributes to meeting the project’s objectives Line Items: Personnel Fringe Benefits Travel Equipment Supplies Contracts Other Indirect Costs 8

9 Project Work Plan EHB will pre-populate the Project Work Plan with information submitted in the FY 2012 NCA NCC An abbreviated sample Project Work Plan is available at http://www.hrsa.gov/gra nts/apply/assistance/nca http://www.hrsa.gov/gra nts/apply/assistance/nca Project Work Plan Fields: Goal Objective Description Progress Report Activity Expected Outcome Data Evaluation Measurements Person/Area Responsible Time Frame Comments 9

10 Project Work Plan Instructions for completing the Project Work Plan are available in Appendix A of the NCA NCC Instructions. There are two options for reporting progress for every objective: –If the pre-populated objective will be retained, use the Progress Report field to report progress made since July 1, 2012 and edit the Objective Description field as needed to indicate plans for FY 2013. –If the pre-populated objective will be significantly changed or replaced with something completely new for FY 2013, delete the objective and use the narrative box that appears to both report progress and justify the deletion. A new objective can then be added to replace the deleted objective. Provide an update for each objective in the Progress Report text box of the form. Additional Goals, Objective Descriptions, Activities, Expected Outcomes, Data Evaluation Measurements, Person/Area Responsible, and Time Frames may be added, edited, or deleted. Comments must be provided. 10

11 Performance Measures Form The Performance Measures Form will pre-populate with data from the FY 2012 NCA NCC Provide quantitative and qualitative updates in the Progress Towards Goal field for each performance measure Do not edit information pre-populated for the four required performance measures. For these measures, complete the Progress Towards Goal field and Comments field, as applicable Grantees may edit all data for additional performance measures and/or add new performance measures 11

12 Required Performance Measures 1.National Grantee Satisfaction 2.Program Requirements T/TA 3.Performance Improvement T/TA 4.Program Development/Analysis T/TA The HRSA BPHC 2012 Grantee Satisfaction Survey did not address the four Performance Measures. NCAs should base progress on other available data sources such as Uniform Data System information and organizational surveys. If such data sources are not available, use the HRSA BPHC 2011 Grantee Satisfaction Survey data for the Quantitative Progress Toward Goal subfield and use anecdotal evidence for the Qualitative Progress Toward Goal subfield. Detailed instructions are provided in Appendix B of the NCA NCC Instructions 12

13 Program Narrative Update Attachment 1 Discuss broad issues and changes that have impacted the target audiences served and the NCA, as well as overarching progress on the work plan since July 1, 2012 Program Narrative Update Items: 1.Any significant progress/proposed changes to the project 2.Any significant changes or outcomes 3.Any significant changes/updates to linkages or partnerships 4.Any significant changes/updates to the staffing plan 5.Any major expected changes/plans/considerations for activities beyond the upcoming budget period Note: Grantees should discuss any significant anticipated changes to their Project Work Plan with their Project Officer prior to submission. 13

14 Attachments 2-6 (As Applicable) Attachment 2: Staffing Plan Attachment 3: Position Descriptions for Key Personnel Attachment 4: Biographical Sketches for Key Personnel Attachment 5: Summary of Contracts/Agreements Attachment 6: Other Relevant Documents 14

15 Important Reminders Progress reports must be submitted in EHB by 5 PM ET on April 24, 2013 Progress reports may not exceed 40 pages Failure to submit the NCC by the established deadline or submission of an incomplete or non-responsive progress report may result in a delay of NoA issuance or a lapse in funding 15

16 Resources NCA TA Webpage http://www.hrsa.gov/grants/apply/assistance/nca Health Center Program Requirements http://bphc.hrsa.gov/about/requirements http://bphc.hrsa.gov/about/requirements 16

17 Technical Assistance Contacts Program related questions Consult with your Project Officer NCA NCC Instructions related questions Beth Levitz: BPHCNCA@hrsa.gov or 301.594.4300BPHCNCA@hrsa.gov Budget related questions Brian Feldman: bfeldman@hrsa.gov or 301.443.3190bfeldman@hrsa.gov Electronic completion and submission questions BPHC Helpline: BPHCHelpline@hrsa.gov or 877.974.2742BPHCHelpline@hrsa.gov 17


Download ppt "Fiscal Year (FY) 2013 National Training and Technical Assistance Cooperative Agreements (NCA) Non-Competing Continuation HRSA 5-U30-13-001 NCA TA Website:"

Similar presentations


Ads by Google