Presentation is loading. Please wait.

Presentation is loading. Please wait.

CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.

Similar presentations


Presentation on theme: "CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group."— Presentation transcript:

1

2 CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group

3 21 March 2001JCOP presentation - L. Scibile and the CSAM Team2 Introduction S afety information A larm system M onitoring system C ERN

4 21 March 2001JCOP presentation - L. Scibile and the CSAM Team3 Introduction C ERN S afety A larm M onitoring = CSAM

5 21 March 2001JCOP presentation - L. Scibile and the CSAM Team4 Detection equipment Background Hard - wired network Computer-based network What’s next ? Fire CDIN-00052 B104-R-02

6 21 March 2001JCOP presentation - L. Scibile and the CSAM Team5 CSAM Mandate u The CSAM will provide CERN with an integrated safety alarm system covering acquisition, transmission, logging and display for all the CERN sites, the LHC machine, LHC experiments and experimental areas. The system will be incorporated into the safety, technical, accelerator, and experiment control rooms. u The requirements of the system were defined by the AL3S* working group. u The mandate of the project team covers the system specification, prototyping, tendering, installation and integration of the product in the existing monitoring architecture. * Safety alarms require the immediate intervention of the fire brigade and are defined at CERN as 'Alarms of Level 3' (AL3S)

7 21 March 2001JCOP presentation - L. Scibile and the CSAM Team6 CSAM Specification u For the Fire Brigade u Safety alarm acquisition from all CERN safety zones u Local monitoring from each safety zone u Central monitoring, archiving, display, reporting and configuration u Non-interruptible 24h/365d system based on redundant networks u Specific human computer interfaces and tools for the alarm handling u Real-time monitoring of the correct functioning of all sub-systems. u For the Experiments and the other control rooms u A safety alarm gateway to external systems u A flexible system architecture for the integration of the LHC and LHC experiments future alarms. u A modular acquisition and local monitoring system based on standard industrial equipment

8 21 March 2001JCOP presentation - L. Scibile and the CSAM Team7 CSAM Specification, cont. u No common mode of failure u Power supply, Location, server, display, acquisition module,etc. u INB compliant system based on redundant transmission paths. u Availability requirements u In order to meet the availability requirements of  99.8% set by the AL3 Working Group, a Safety Integrity Level (SIL) 2 has been fixed. u A supervision and monitors the availability of all sub-systems and generates performance reports.

9 21 March 2001JCOP presentation - L. Scibile and the CSAM Team8 CSAM specifications, cont. Transmission System Technical Data Interface Safety Alarm Detection Interface Safety Alarm Transmission Redundant Safety & Technical Alarm Transmission Central Alarm Display Human Computer Interface Supervision Local Alarm Display Safety Actions Reference Database (Configuration) Data Exchange Protocol Event Logging System Functional diagram

10 21 March 2001JCOP presentation - L. Scibile and the CSAM Team9 CSAM supervision & maintenance manager Technical Data Server (TDS) Local safety alarms controller Safety alarm networks Safety alarm monitoring centre Safety alarm gateway to external systems (TDS, experiments, XCR, etc.) CERN safety equipment x33 Hardwired Path 1Path 2 TCR consoleSCR console SCR SCADA x2 PLC 1PLC 2 CSAM specifications, cont. PVSS

11 21 March 2001JCOP presentation - L. Scibile and the CSAM Team10 Safety alarm Monitoring centre Remote XCR console SCR SCADA Experiments DCS Experiments Local XCR console Safety alarm gateway to external systems (TDS, experiments, XCR, etc.) CSAM-experiments interface u How u Data exchange protocol u JCOP conventions u For the XCR operators u Only Safety Alarms and safety-related information concerning their experiment. u Also analogue values of safety equipment. u Possible seamless integration in the experiment DCS

12 21 March 2001JCOP presentation - L. Scibile and the CSAM Team11 Local safety alarms controller Safety alarm Monitoring centre CERN safety equipment Remote XCR console SCR SCADA CSAM animation scenario Experiments DCS Technical Data Server (TDS) Experiments Local XCR console Safety alarm gateway to external systems (TDS, experiments, XCR, etc.) Warning

13 21 March 2001JCOP presentation - L. Scibile and the CSAM Team12 Current system

14 21 March 2001JCOP presentation - L. Scibile and the CSAM Team13 Future systems

15 21 March 2001JCOP presentation - L. Scibile and the CSAM Team14 Current System

16 21 March 2001JCOP presentation - L. Scibile and the CSAM Team15 Current System

17 21 March 2001JCOP presentation - L. Scibile and the CSAM Team16 Current system

18 21 March 2001JCOP presentation - L. Scibile and the CSAM Team17 4 alarms Future system

19 21 March 2001JCOP presentation - L. Scibile and the CSAM Team18 B40-5-002 Future system

20 21 March 2001JCOP presentation - L. Scibile and the CSAM Team19 15:16:15Flooding Det.INOND-863-E-T SPS-B-862-R-05Flooding Detected came Future system

21 21 March 2001JCOP presentation - L. Scibile and the CSAM Team20 Prototype

22 21 March 2001JCOP presentation - L. Scibile and the CSAM Team21 What has been done ? u Analysis of technical solutions u IEC61508 standards u Prototype u Technical specifications including: u User requirements u Functional and safety requirements u Product requirements u Interface requirements u Approval of the finance committee

23 21 March 2001JCOP presentation - L. Scibile and the CSAM Team22 What’s next? u Detailed design and testing during year 2001 u Pilot installation planned for APRIL 2002 u Deployment of product on the CERN site in accordance with the LHC and LHC experiments schedule

24 21 March 2001JCOP presentation - L. Scibile and the CSAM Team23 Additional information u Papers u S. Grau, P. Ninin, R. Nunes, L. Scibile, C. Soler, CERN Safety Alarm monitoring Project, 3rd ST workshop Chamonix, February 2000. u L.Scibile, P.Ninin, S.Grau, Functional Safety: a Total Quality Approach, 4st WS Chamonix, 2001. u S. Grau, L. Scibile, F. Balda, A. Chouvelon, Application of risk management for control and monitoring systems, 4rd ST workshop Chamonix, February 2001. u Visit the CSAM Homepage: u http://nicewww.cern.ch/st/mo/CSAM/CSAM.htm u Just come and see us!


Download ppt "CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group."

Similar presentations


Ads by Google