NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.

Similar presentations


Presentation on theme: "NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012."— Presentation transcript:

1 NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012

2 10/9/2015NOAA GOES DCS2 DADDS Updates What’s New –Bug Fixes –Software Manual Completed –O&M Manual Draft Completed NSOF Support Tested Steps for Consistency Waiting for Wallops Review What’s Coming –System Use Agreement Processing and Tracking System (GOES, Argos and DRO) –CS2 Software Updates –Bulk Download (Network List?) Still Need Tables Populated: PDT, Contact Information, Group Contacts

3 10/9/2015NOAA GOES DCS3

4 10/9/2015NOAA GOES DCS4 Just Added DADDS Operational Notices RSS Feed https://dcs1.noaa.gov Technicians Can update 24 hours a day Users can “subscribe” Please give it a try and let us know what you think Once we work out the “bugs” we will look at using other places, like Meeting Announcements

5 10/9/2015NOAA GOES DCS5 DOMSAT Status Final Option of DOMSAT contract almost ending New Combined Contract expected award early summer 2012 funded by NOS, USGS, BLM, BR and USACE –MOU’s set up for BR, amended for BLM and USACE –USGS made “quid pro quo” arrangement with NOS –NOS funds directly tapped through procurement documents (means no MOU required) 2012 Funding Shortfall NOAA/NESDIS Contributed $20k+ for year If STIWG can not raise funds, next option year may not be exercised STIWG to take to parent committee

6 10/9/2015NOAA GOES DCS6 Operational Activities Major activities NSOF DADDS Power Distribution Units (PDU) Upgrade Completely Redundant Power throughout system Implementation of CS2 Transition Multiple Manufacturers Certified for CS2 All Channels set to “Long Interleaver Off” to recognize CS2 Do not use Long Interleaver Equipment Move at Wallops Tentatively Scheduled for July (?) Construction at Wallops for Extended Period DOMSAT Outages in April Problems with Equipment from SES World Skies First Time too brief for failover to NSOF 2 nd Time Failover to NSOF Failed SES World Skies Made Service Visits to Both Sites…repaired?

7 10/9/2015NOAA GOES DCS7 March 21, 2012 Approximately 4 p.m. Apparently Corrupted Navigation File Sent During Maneuver Caused Satellite to go into “sun acquisition” mode (face the sun) Satellite Went into “Safe” Mode to Protect Itself Exactly what it should do!! New Commands Sent on March 22, 2012 Operation Failed Satellite Placed back in “Storage” Mode for fresh startup (“Cold” Boot) March 23, 2012 Brought Back out of “Storage” Mode Operators Noticed Attempt to go back into “Safe” Mode and Manually Overrode Navigation File Satellite Safely Brought Back Online Engineers Investigated and Repaired Software Glitch GOES 15 Outage

8 10/9/2015NOAA GOES DCS8 DCS System Switched so that GOES East Antennae Picked up GOES West Channels Approximately 60% of GOES West Data Picked up by GOES East Lock Level on Satellite Decreased to 25 Acquisition Percentage Increased to 70% Led to Lowering Lock Level to 25 at both sites permanently Question: Should we recommend all users offset angle whenever possible to attempt to reach both satellites? GOES 15 Outage