Presentation is loading. Please wait.

Presentation is loading. Please wait.

REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1.

Similar presentations


Presentation on theme: "REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1."— Presentation transcript:

1 REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1

2 Presentation Outline Introduction Instructions for Site Visit Acquisition Information Logistics of Site Visit Amendments Invitation for Bid (IFB) Due Date 2

3 Introduction Repair Electrical Distribution System to the Communication Building Solicitation # NND15529509E Contracting Officer Representative (COR): Stanford Dickson Contracting Specialist (CS): Jenny Staggs Contracting Officer (CO): Brian Bowman 3

4 Instructions of Site Visit Remain with group, even if badged This presentation, including the sign-in sheets, will be posted as part of an amendment to the solicitation (everyone must sign in) Procedures for asking and presenting questions  All questions shall be submitted in writing  Due date for all questions is March 19, 2015  Q&As will be posted as an amendment to the solicitation 4

5 Instructions of Site Visit Photography- no pictures can be taken during this site visit Safety  No Personal Protective Equipment (PPE) required  No smoking, except in designated smoking areas 5

6 Acquisition Information This acquisition is a Economically Disadvantaged Women-Owned (EDWOSB) Set-Aside  In accordance with FAR 19.1503 (b), a EDWOSB small business concern must be (1) registered in the System for Award Management (SAM); (2) self-certified as an EDWOSB concern in SAM; and (3) has submitted documents verifying its eligibility at the time of initial offer to the WOSB Program Repository. The contract will not be awarded until all required documents are received. 6

7 Acquisition Information Magnitude of project: $1,000,000 - $5,000,000 Period of Performance- a total of 245 days from Notice to Proceed (NTP) 7

8 Logistics of Site Visit Group will take their own vehicles to B4824 This site visit should take approximately 1 hour to complete 8

9 Amendments Continue to monitor the solicitation on line  All amendments to solicitation must be acknowledged in block 19 of the Standard Form 1442, Solicitation, Offer and award.  Failure of your acknowledgement may result in rejection of offer 9

10 Invitation for Bid Due Date Invitation for Bid (IFB) Due Date and Bid Opening  March 31, 2015, 2:00 p.m. PDT  Original Bid + 1 copy  Bids will be opened at that time and the apparent successful bidder will be announced Everything said at this site visit is not binding. All official changes to the IFB will be issued via a written amendment. Thank You for Coming 10


Download ppt "REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1."

Similar presentations


Ads by Google