Presentation is loading. Please wait.

Presentation is loading. Please wait.

Portside Logistics Boundary Rainier Pointe Access Library Local Improvement District Formation Hearing LID 14-1 for Construction of 66 th Avenue East March.

Similar presentations


Presentation on theme: "Portside Logistics Boundary Rainier Pointe Access Library Local Improvement District Formation Hearing LID 14-1 for Construction of 66 th Avenue East March."— Presentation transcript:

1 Portside Logistics Boundary Rainier Pointe Access Library Local Improvement District Formation Hearing LID 14-1 for Construction of 66 th Avenue East March 24, 2015

2

3 DESCRIPTION OF IMPROVEMENTS Construction of a new street to commercial and multifamily access standards in accordance with FMC 12.20.050 from the south boundary of Pierce County Assessor’s Parcel No. 0420071705, to 26 th Street East, including demolition, grading, and construction of curb, gutter, sidewalk, landscape strip, street lighting, undergrounding of utilities, and related storm drainage facilities.

4 DESCRIPTION OF IMPROVEMENTS Fife Municipal Code 12.20.050 Commercial and multifamily access street. The standards for a neighborhood access street are as set forth in Exhibit “B” which follows. Exhibit B: Commercial and Multifamily Access Street

5 IMPROVEMENTS ARE IN ADOPTED PLAN

6 Schedule and Funding TASK201520162017 Right-of-way Acquisition Final Design and Bidding Construction Funding SourceContribution LID BANS$1,900,000 Developer’s Extra Funds $300,000 Mitigation Funds$200,000 Public Safety Fund$700,000 Stormwater Fund$400,000 Total Funding$3,500,000


Download ppt "Portside Logistics Boundary Rainier Pointe Access Library Local Improvement District Formation Hearing LID 14-1 for Construction of 66 th Avenue East March."

Similar presentations


Ads by Google