Presentation is loading. Please wait.

Presentation is loading. Please wait.

Peak RCCo Performance Metrics Draft –November 2013.

Similar presentations


Presentation on theme: "Peak RCCo Performance Metrics Draft –November 2013."— Presentation transcript:

1 Peak RCCo Performance Metrics Draft –November 2013

2 CategoryObjectiveMeasure 1.Constraint Management – Reliability Coordination Mitigate Transmission constraints in a timely manner in line with NERC standards and MISO Goals Duration in which a Transmission Element (constraint) is over its System Operating Limit (SOL). A constraint normally consists of a monitored element for the loss of contingent element (OTDF), but also includes base case constraints (i.e. PTDFs, Interfaces, IROLs, etc.) 2. Constraint Management – Reliability Coordination Effectively commit/de-commit units to mitigate a constraint When necessary to provide relief for transmission constraint relief purposes, determine if the correct number of minimum cost units were committed to provide necessary, effective relief and whether those units were also taken off line in a timely manner. 3. Constraint Management – Reliability Coordination Effectively manage constraints using Security Constrained Economic Dispatch Calculate the Average Percentage of State Estimator Flow on the constraint vs. State Estimator Limit on the constraint. Each constraint is individually scored, with the category score based on an average. 4. Constraint Management – Reliability CoordinationEffectively manage Market Flow Relief Obligations and Market to Market constraints All Market Flow Relief obligations received via TLR are acknowledged in a timely manner in accordance with NERC Standards, and relief is provided via the market dispatch. Market to Market constraints are managed in accordance with their respective Joint Operating Agreement. 5. Network Applications – EMS Engineering M onitor the performance of the State Estimator solution and unsolved contingencies in the Real Time Contingency Analysis Number of instances State Estimator solutions outside of performance index measures, number of unsolved contingencies, high availability and completeness of Real Time Contingency Analysis solutions, and response time of the EMS engineer to address above measures. 6. Engineering Studies (current day) – Regional Engineering Deliver accurate study cases and results for the morning and afternoon peak conditions to the operators in a timely manner Measure engineering study cases for accuracy and delivery with in targeted time. MISO R.C. Measures

3 CategoryObjectiveMeasure 7. General – Real Time Operations Effective management of event/issue which is not identified in any other category and which has significant impact on the network and/or participants. Measure the proactive/positive steps taken by Real Time Ops to mitigate the impact of an event/issue that is not measured in any of above performance criteria. 8. Outage Coordination – Forward OperationsEffectively study adverse impacts of Planned Outages on the System. Measure of Transmission constraints identified by the studies have an operating guide or a constraint mitigation plan to manage the constraint that’s caused by the planned outage. 9. Next-Day Studies – Forward OperationsEffectively identify Real Time constraints in Next- Day Studies Measure of Real Time Transmission constraints identified in the study. 10. Load and Wind Forecasting – Application Information Services 11. Tool and Application Availability – Application Information Services 12. Forward Operations and Application Information Services Measure how effectively Forward Ops and AIS managed an event/issue which is not identified in any other category and which has significant impact on the network and/or participants Capture the "impact" to MISO Systems and Operations MISO R.C. Measures

4 FERC Considerations 1. Percentage of RC directives issued correctly and when needed. 2. Availability/correctness of day ahead operating studies. a. IROL/SOL defined 3. Availability/correctness of real-time studies a. IROL/SOL defined 4. Availability/correctness of monitoring tools. a. IROL/SOL defined 5. Up to date and effective operating procedures regarding a. Balancing Operations b. Transmission Operations i. Identification of specific generation dispatch to resolve WECC Path overloads in real time. ii. Identification of specific operating contacts to develop, agree upon, and implement procedures. iii. Detailed Restoration procedures of lines that have potential phase angle issues when opened and identification of generation resources that are effective in facilitating restoration. Supported with operating studies. iv. Identification and resolution of voltage issues c. System Restoration d. Operations Planning e. Emergency Operations f. Generator Operational Requirements g. Certification and Training Requirements h. Operating agreements 6. Implementation/resolution of Recommendations (pertaining to the RC) from the Arizona-Southern California September 8, 2011 outages. 7. Availability of support staff (on-site or remote).


Download ppt "Peak RCCo Performance Metrics Draft –November 2013."

Similar presentations


Ads by Google