BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

Similar presentations


Presentation on theme: "BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park."— Presentation transcript:

1 BUILDING THE FINDHORN WIND PARK

2 Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park

3 The planning process Cost: £100k- No guarantee! Wind resource assessment Financial model RAF Application for planning permission Visual impact study Noise study Bird study

4 Visibility of the proposed turbines

5 The effect of other wind farms and proposals

6 EXCAVATION

7

8 ROTOR

9

10

11 NARCELLE

12 The annual output is 1,537 megawatt hours per annum

13 1,537 MWhr/annum 350 homes 475,000 litres of oil 660 tonnes carbon dioxide Planning permission Granted 18 Jan. 05

14 Financial Model ROC’s & LEC’s are about 50% of income Cost of generating power = 1.6 to 5.9 pence/kWh